The City of El Paso is soliciting qualified contractors for the design‑build rehabilitation of the General Aviation (GA) ramp at El Paso International Airport, covering Stages 2 and 3 of the project. The work includes demolition of existing pavement, sub‑grade preparation, installation of new asphalt overlays, concrete‑encased electrical duct banks, storm‑drain and utility upgrades, pavement marking, and associated site restoration. The contract will be awarded on a low‑bid basis, with performance and payment bonds required, and must comply with FAA AIP, AC 150/5370‑10H, and applicable federal, state, and local construction standards. Bids are due 9 Sept 2026; a non‑mandatory pre‑bid conference is scheduled for 5 Aug 2026 via Microsoft Teams. The anticipated contract award is November 2026, with construction expected to commence after a Notice to Proceed is issued.
• Scope: full GA‑ramp reconstruction (pavement, sub‑grade, utilities, drainage, lighting, markings).
• Location: El Paso International Airport, El Paso, TX.
• Procurement: Low‑bid formal construction, mandatory performance & payment bonds.
• Key dates: Issue 7/28/26, Pre‑bid 8/5/26, Questions by 8/12/26, Bid deadline 9/9/26, Award ≈ Nov 26.
• Required certifications: Licensed Texas Engineer, FAA compliance, safety plans, QC program.
• Contact: Abril Bravo, Purchasing & Strategic Sourcing, (915) 335‑5939.