Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Laguna Creek Multi-Functional Corridor Project

City of Elk Grove·California

Laguna Creek Multi-Functional Corridor Project

Closes 2/18/2026$3.5M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Construction of a half‑mile elevated multi‑functional corridor along Laguna Creek in Elk Grove, providing a 10‑ft paved roadway with 2‑ft decomposed‑granite shoulders, post‑and‑cable fencing, two prefabricated steel‑truss bridges with concrete decks, flood‑way excavation, and rock‑slope protection. The project includes extensive earthwork, grading, erosion‑control, temporary water‑pollution controls, and related civil‑engineering work. • ½‑mile elevated corridor with 10‑ft paved surface and 2‑ft shoulders • Two prefabricated steel‑truss bridges (≈200 ft and ≈165 ft) with concrete decks • Flood‑way excavation, rock‑slope protection, and extensive erosion‑control measures • Total estimated OPC $4.539 M; duration 170 working days; requires Class A license, pre‑qualification, DIR registration, and CWTA compliance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kim Brown(Project Coordinator)

[email protected]

(916) 627-3316

Key dates

Opened
12/18/2025
Questions due
2/6/2026
Closes
2/18/2026
Duration
170 Working Days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
WDR018

Budget estimate

$3,500,000 – $5,000,000

The Opinion of Probable Cost (OPC) listed in the solicitation is $4,539,000, indicating the city’s budgeted contract value. Accounting for typical contractor overhead, profit margins (≈10‑15 %), and potential change‑order reserves, the expected earnings for the prime contractor would likely fall between $3.5 M and $5 M. Factors influencing the range include the final negotiated price, subcontractor costs, and any additional scope identified during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Elk Grove·California

Top match · 69%

Laguna Creek Trail and Bruceville Road Sidewalk Improvements Project

Closes 11/17/2026Opened 10/15/2026

City of Austin·Texas

65% match

Williamson Creek - Tributary 4 Channel Stabilization

Rolling / TBD closeOpened 9/28/2026

City of Austin·Texas

65% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

California Grants·California

64% match

Proposition 1 Lower Los Angeles River Grants

Rolling / TBD closeOpened 1/27/2025

City of Laredo·Texas

64% match

Zacate Creek Renovation ORLP/TPWD Project

Closes 11/19/2026Opened 9/13/2026

City of Goshen, Indiana·Indiana

64% match

Cherry Creek Trailway, Phase I

Closes 11/5/2026Opened 10/17/2026

Houston-Galveston Area Council·Texas

64% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

64% match

Ryerson Station State Park – Park Improvements and Stream Corridor Restorations

Closes 11/12/2026Opened 10/14/2026

Illinois Natural Resources·Illinois

64% match

Recreational Corridor greenways and trails planning

Rolling / TBD closeOpened 7/1/2026

City of Charlotte·North Carolina

63% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

California Grants·California

63% match

Urban Streams Restoration Program

Rolling / TBD closeOpened 10/1/2026

City of Pasadena·California

63% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

Santa Clara Valley Water District·California

63% match

C0720 Coyote Percolation Dam Phase 2

Closes 11/18/2026Opened 10/15/2026

City of Middletown·Connecticut

63% match

Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

California Grants·California

63% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

California Department of Transportation·California

63% match

Landscape planting.

Closes 11/18/2026Opened 10/19/2026

California Grants·California

63% match

2026 Solutions for Congested Corridors Program

Closes 11/19/2026Opened 9/30/2026

Connecticut City of Middletown·Connecticut

63% match

Bid #2026-008- Pistol Creek Multi-Use Trail

Closes 12/2/2026Opened 10/30/2026

City of El Cajon·California

63% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

California Grants·California

63% match

Proposition 1 Regionwide Grants

Rolling / TBD closeOpened 1/27/2025

Texas Houston-Galveston Area Council·Texas

63% match

Sienna Area Corridor Plan

Closes 12/11/2026Opened 10/29/2026

California Grants·California

63% match

RMC Lower LA River Grant Program

Rolling / TBD closeOpened 11/19/2024

City of Charlotte·North Carolina

63% match

SouthPark Loop - Cameron Valley Parkway

Rolling / TBD closeOpened 1/1/2027

Town of Cutler Bay·Florida

62% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

Oak Manor Municipal Utility District·Texas

62% match

Waterline Rehabilitation along Oak Trail, Oak Manor Drive, & Shady Oak Court

Closes 11/5/2026Opened 10/23/2026