The project involves installing an additional electrical power utility service from the Saudi Electricity Company (SEC). The scope includes completing the project within 45 days from the notice to proceed (NTP), which may be extended depending on the processing time taken by SEC for the new meter application. Bidders must provide all required documentation necessary for the application of the additional electrical power utility service. The project requires the installation of a new electrical power service, including a 100 kVA load increase at 220V 3P. The cable shall be routed through rigid steel conduits or enclosed in non-perforated metal cable ducts.
• The existing electrical service is 110V 1P/220V 3P.
• The required additional load is 100 kVA at 220V 3P.
• The total proposed load after the increase is 260 A.
• The cable specifications include a 4C + G cable.
• The system nominal voltage is 110V 1P/220V 3P.
• The ATS rating is 200 A.
The bidder must provide the necessary information based on the Scope of Work (SOW) and observations gathered during the site visit.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.