The estimated budget for this project can be estimated based on the total costs of the thirteen categories of work, which are: Masonry ($2,171,000), Miscellaneous & Ornamental Iron ($204,000), Waterproofing, Dampproofing and Caulking ($187,000), Roofing & Flashing ($1,825,000), Glass & Glazing ($36,000), Tile ($108,400), Acoustical Tile ($172,800), Resilient Floors ($132,500), Painting ($438,600), Fire Protection Sprinkler System ($471,000), Plumbing ($902,300), HVAC ($2,814,000), and Electrical ($5,350,000). The total estimated cost is $14,011,600. However, this is not the budget to a single contractor, as the project is divided into multiple categories. Assuming that each category will be awarded to a separate contractor, the budget to each contractor will depend on the specific category they are prequalified for. For example, a contractor prequalified for the Masonry category can expect to earn around $2,171,000, while a contractor prequalified for the Electrical category can expect to earn around $5,350,000.