The Dallas County Hospital District (Parkland Health) is seeking a qualified design team to provide comprehensive architectural and engineering design services for the new Southeast Dallas Health Center campus. The scope includes site planning, rezoning, schematic design, design development, construction documents, construction administration, commissioning, and activation services for a multi‑program campus that may include an inpatient tower, ambulatory clinics, surgery suites, urgent care, imaging, and a central utility plant. The solicitation emphasizes LEED Gold certification, enhanced commissioning, and a 25 % M/WBE participation goal. Submissions are due January 9 2026; pricing will be requested after the qualification phase.
• Full‑service design (architectural, civil, structural, MEP, interior, and site‑planning) for a ~500,000 GSF health‑care campus.
• Required deliverables: program development, schematic & design‑development packages, full construction‑document set, GMP support, construction‑admin, commissioning, and equipment activation.
• Mandatory compliance with CMS, Joint Commission, Texas Accessibility Standards, Dallas Green Construction Code, and LEED Gold (enhanced commissioning).
• M/WBE goal of 25 % spend; required Subcontractor List, Letter of Intent, and Good‑Faith Effort documentation.
• No pricing required with the qualification; pricing will be solicited from the top‑ranked firm after SOQ evaluation.