The City of Redding is seeking a contractor to construct the Sacramento River Trail Overlook, a public amenity featuring a plaza, benches, a shade structure, drinking fountain, interpretive panels, landscaping, and related infrastructure. The scope includes site demolition, grading, utility installation (water main, storm drain, irrigation), concrete walls (with an optional rammed‑earth alternate), curbs, pavers, a steel trellis canopy, lighting, and a one‑year landscape maintenance package. The project must be completed within 90 working days after mobilization, with a bid opening on June 23, 2026.
• Comprehensive civil works: earthwork, utilities, concrete walls, curbs, paving, and drainage.
• Structural steel canopy and optional rammed‑earth retaining walls.
• Full landscape package: planting, irrigation system, and one‑year maintenance.
• Required bonds, insurance, prevailing‑wage compliance, and strict schedule/liquidated‑damage provisions.