The solicitation calls for a subcontractor to perform the complete electrical service entrance conversion for a demolition‑phase project at a Newark public‑school site. The work includes supplying and installing new panelboards, conduit, trenching, lighting, grounding, a digital timer, emergency‑stop device, socket meter, and related testing and turnover documentation. The contractor must also coordinate utility de‑energization, obtain permits, and remove existing electrical equipment once the new system is operational.
• Install two outdoor‑rated 1‑phase 120/240 V panelboards, associated breakers, and a digital 24‑hour time switch with E‑Stop shunt‑trip.
• Provide trenching, conduit (PVC, EMT, flexible metal), grounding, and install a new 13‑terminal socket meter (utility‑provided pole & transformer).
• Supply and power parking‑lot LED lighting, tank‑management enclosure/AC, and all required receptacles; perform testing, inspection, and deliver as‑built drawings and turnover package.
• Coordinate de‑energizing the existing service with PSE&G and the Owner; demolish old transformers/panels after the new system is verified.
• Follow NEC, NESC, NEMA, UL, IEEE, and local NJ codes; include seismic, rodent‑screening, and corrosion‑resistant specifications.