Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Design and Construction of Levee Access Manholes for…

U.S. Department Of Defense·Missouri

Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)

Closes 10/26/2026$1M – $3.4MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers, Kansas City District is seeking a design‑build contractor to design and construct access manholes on the Fairfax‑Jersey Creek Levee Unit in Kansas City, Kansas. The work must provide minimally invasive (trenchless) excavation to preserve levee integrity, install manholes with a minimum 42‑inch inside diameter, and enable CCTV inspection of the existing seepage collection system. The contractor is responsible for all design, field verification, utility locating, permitting, temporary flood protection, construction, and as‑built documentation. The contract ceiling is $3.4 M, with an estimated price range of $1 M–$5 M. Performance must begin within 10 days of award and be completed within 540 calendar days. • Location: Fairfax‑Jersey Creek Levee Unit, Kansas City, KS • Contract ceiling: $3,400,000 (max) • Estimated price range: $1,000,000–$5,000,000 • Design‑build scope: design, field verification, utility locate, trenchless excavation, manhole installation, temporary flood protection, QA/QC, as‑built drawings • Minimum manhole inside diameter: 42 inches; depth up to ~25 ft • Required performance period: 540 days (start ≤10 days after award) • Mandatory performance bonds required • No offer guarantee required • Submission deadline: 26 Oct 2026, 10:00 AM

Attached files

Contact

Erick Ottoson

[email protected]

(816) 389-3878

Key dates

Opened
9/25/2026
Closes
10/26/2026
Duration
540 days

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912DQ26RA065

Budget estimate

$1,000,000 – $3,400,000

The solicitation caps the contract award at $3,400,000 and states an estimated price range of $1,000,000 to $5,000,000. Because offerors are not required to reach the upper bound, a realistic award is likely between the low estimate and the ceiling. Factoring in design‑build risk, required performance bonds, and the specialized trenchless excavation methods, the expected budget to the contractor would probably fall in the $1.0 M–$3.4 M range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Missouri

Top match · 89%

Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)

Closes 5/27/2027Opened 5/27/2026

U.S. Department Of Defense·Missouri

77% match

Corning and Holt 10 Levee Repairs

Closes 7/21/2027Opened 7/21/2026

U.S. Department Of Defense·Missouri

77% match

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025

U.S. Department Of Defense·Missouri

77% match

Levee Repair at MRLS L246

Closes 5/28/2027Opened 5/28/2026

U.S. Department Of Defense·Missouri

76% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

Unified Government of Wyandotte County and Kansas City, KS·Kansas

75% match

Manhole Covers, Frames & Catch Basin Inlet Grates & Frames for Environmental Services

Closes 11/18/2026Opened 10/22/2026

Delaware County Regional Sewer District·Ohio

73% match

Tartan Fields Manhole Replacement

Closes 11/13/2026Opened 10/13/2026

U.S. Department Of Defense·Kansas

73% match

Atchison Storm Sewer Separation Improvements, Atchison, Kansas

Closes 11/13/2026Opened 10/13/2026

Municipality of Skagway·Alaska

73% match

West Creek Levee Improvements

Closes 11/9/2026Opened 10/12/2026

U.S. Department Of Defense·Arkansas

73% match

St Francis Town Levee Renovation

Closes 11/23/2026Opened 10/22/2026

Kansas Department of Wildlife and Parks·Kansas

73% match

Pratt Water System Improvements

Closes 11/10/2026Opened 10/12/2026

City of Cedar Rapids·Iowa

72% match

Ellis Blvd NW Levee and Floodwall Improvements

Closes 11/18/2026Opened 10/21/2026

Kansas Turnpike Authority·Kansas

71% match

Kansas Turnpike Authority Project KTA 8189 – Bridge Painting and Traffic‑Control on I‑335 (Osage & Shawnee Counties)

Closes 11/10/2026Opened 10/14/2026

City of Lawrence·Kansas

71% match

MS-220015A Lawrence Pump Station 9 Improvements

Closes 12/8/2026Opened 10/27/2026

Missouri Department of Transportation·Missouri

70% match

KC District, City of Kearney, Mack Porter Park Connector Shared Use Path

Closes 11/3/2026Opened 10/7/2026

City of Carver·Minnesota

70% match

Carver, City of Certified Levee Improvements Rebid BMI No. 0C1.123664

Closes 11/12/2026Opened 10/21/2026

U.S. Department Of Defense·Louisiana

70% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026

Shawnee County·Kansas

70% match

Construction of NW Maple Hill over Kansas River

Closes 12/2/2026Opened 10/26/2026

Hamilton County, IN·Indiana

70% match

Public Safety Training Center Roadway and Levee

Closes 11/8/2026Opened 10/26/2026

Great Rivers Greenway·Missouri

70% match

GRG 2026-009-725I - Missouri Greenway: Monarch Chesterfield Levee Trail Signage Replacement Project

Closes 11/6/2026Opened 10/12/2026

City of Kearney·Missouri

70% match

Mack Porter Park Connector Shared Use Path - Kearney, MO

Closes 11/3/2026Opened 10/6/2026

Manatee County - Purchasing Division·Florida

69% match

LIFT STATION 9-A FORCE MAIN EXTENSION

Closes 11/20/2026Opened 10/9/2026

U.S. Department Of Defense·Illinois

69% match

Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication

Closes 11/30/2026Opened 10/15/2026

James City County·Virginia

69% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

DuPage County - Procurement Services·Illinois

69% match

421 Floodproofing

Closes 11/17/2026Opened 10/22/2026