The United States Coast Guard is soliciting proposals for dockside repairs to the USCGC MARCUS HANNA (WLM 554). The work includes various preservation and repair tasks such as fire prevention requirements, hydraulically operated cargo hatch inspection and service, main diesel engine exhaust piping commercial cleaning, and more. The contractor will be required to provide suitable tenting to create or maintain required ambient conditions for preservation and to contain all waste generated during preservation processes. The contractor must also provide an independent NACE-certified level 3 inspector for the preservation of all critical-coated surfaces.
Some key work items include:
* WORK ITEM 1: Fire Prevention Requirements
* WORK ITEM 2: Hydraulically Operated Cargo Hatch, Inspect and Service
* WORK ITEM 3: Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean
* WORK ITEM 4: Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean
* WORK ITEM 5: Circuit Breakers (60 Hz), Inspect and Test
* WORK ITEM 6: Vent Ducts, Engine And Motor Room, All, Commercial Cleaning
* WORK ITEM 7: Vent Ducts, Galley and Pantry Room, All, Commercial Cleaning
* WORK ITEM 8: Vent Ducts, Laundry Exhaust, Commercial Cleaning
* WORK ITEM 9: Vent Ducts, All Other, Commercial Cleaning
* WORK ITEM 10: Hydraulic Chain Stoppers, Inspect And Service
* WORK ITEM 11: Hydraulic Crossdeck Winches, Inspect And Service
* WORK ITEM 12: Hydraulic Inhaul Winch, Inspect And Service
* WORK ITEM 13: Mechanical Chain Stoppers, Inspect and Service
* WORK ITEM 14: Hull Fittings (Mooring and Towing), Inspect and Test
* WORK ITEM 15: Warping Capstan (Aft), Inspect and Service
* WORK ITEM 16: Single Point Davit, Disassemble and Inspect
* WORK ITEM 17: Buoy Crane, Inspect And Service
* WORK ITEM 18: Grey Water Holding Tanks, Clean and Inspect
* WORK ITEM 19: Tanks, Grey Water Holding, Preserve, Partial
* WORK ITEM 20: Grey Water Piping, Clean and Flush
* WORK ITEM 21: Sewage Holding Tanks, Clean and Inspect
* WORK ITEM 22: Tanks (Sewage Holding), Preserve, Partial
* WORK ITEM 23: Sewage Piping, Clean and Flush
* WORK ITEM 24: Decks – Exterior (Buoy or Construction Deck), Preserve 100%
* WORK ITEM 25: Flame Detectors, Replace
* WORK ITEM 26: ATON Tie-down, Install
* WORK ITEM 27: Buoy Crane Main Winch, Replace
* WORK ITEM 28: Insulation, Various, Renew
* WORK ITEM 29: Buoy Deck Scuttle, Replace
* WORK ITEM 30: Point of Use Potable Water Filters, Install
* WORK ITEM 31: Exhaust Stacks (Exterior), Preserve - Partial
* WORK ITEM 32: Tenting, Provide
* WORK ITEM 33: Independent NACE Inspector (Level 3), Provide