Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Wastewater and Stormwater Sewer Network Connectivity…

U.S. Department Of Defense·U.S. Armed Forces – Pacific

Wastewater and Stormwater Sewer Network Connectivity Verification, USAG-J, Kanto Area

Closes 7/21/2026$200k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The US Air Force is soliciting a comprehensive sewer network connectivity survey for the USAG-Japan area. The contractor must provide all necessary services and equipment to perform the survey. The project manager must possess a Professional Engineer license, and key personnel must have a land surveyor license or equivalent. The contractor must have valid licenses to work in Japan. • The contractor must provide copies of licenses and certificates prior to award. • The project will be performed entirely in Japan. • The contract is for a firm-fixed price service. • The contractor must have the necessary qualifications and equipment to perform the survey.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tyrie Tanaka

[email protected]

Key dates

Opened
7/7/2026
Closes
7/21/2026
Projected award
8/20/2026

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541370
Solicitation №
FA520926Q0068

Budget estimate

$200,000 – $500,000

The budget for this contract can be estimated based on the scope of work, which includes a comprehensive sewer network connectivity survey. The cost of such a survey can vary depending on the size of the area, the complexity of the survey, and the equipment required. A rough estimate for a similar project could be between $200,000 and $500,000, considering the need for specialized equipment and personnel with Professional Engineer licenses. However, this is a rough estimate and the actual budget could be higher or lower, depending on the specifics of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Douglas·Wyoming

Top match · 67%

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Sanibel·Florida

66% match

WASTEWATER COLLECTION SYSTEM REPAIRS - PHASE 1

Closes 11/12/2026Opened 10/13/2026

James City County·Virginia

65% match

GROVE NEIGHBORHOOD STORMWATER AND SANITARY SEWER IMPROVEMENTS

Closes 11/12/2026Opened 10/21/2026

City of Douglas·Wyoming

64% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Washougal, WA·Washington

64% match

Stormwater Filter Facility Maintenance

Closes 11/5/2026Opened 10/9/2026

City of Shawnee·Kansas

64% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

Georgia City of Covington·Georgia

64% match

2026-26 Annual Stormwater Rehabilitation and Maintenance Construction Services

Closes 1/12/2027Opened 10/20/2026

U.S. Department Of Defense·New York

64% match

Municipal Separate Storm Sewer System (MS4)

Closes 11/11/2026Opened 10/26/2026

Connecticut Town of Plainfield·Connecticut

64% match

MS4 Stormwater GIS Data Development Screening and Reporting Services

Closes 11/4/2026Opened 9/17/2026

City of South San Francisco·California

64% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

Connecticut Town of Plainfield·Connecticut

64% match

MS4 Stormwater GIS Data Development Screening and Reporting Services

Closes 11/4/2026Opened 9/17/2026

City of Canton·Georgia

64% match

Professional Emergency Repair Services for On-Call Water, Sanitary Sewer, and Stormwater

Closes 12/11/2026Opened 10/29/2026

Georgia City of Sandy Springs·Georgia

63% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

West County Wastewater·California

63% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Georgia City of Lagrange·Georgia

63% match

South Davis Road (SR14) Water and Sewer Relocations

Closes 11/5/2026Opened 10/5/2026

City of Urbana·Illinois

63% match

Miscellaneous Sewer Repairs 2027, Section 26-00718-00-MS

Closes 11/12/2026Opened 10/29/2026

Mississippi Department of Finance and Administration·Mississippi

63% match

Wastewater Facility Improvements (Sanitary Sewer) (GS# 101-309)

Closes 11/19/2026Opened 10/20/2026

City of San Diego·California

63% match

As-Needed Environmental Services

Closes 11/2/2026Opened 9/24/2026

Village of Hoffman Estates·Illinois

63% match

2026 Storm Inlet Cleaning Project

Closes 11/12/2026Opened 10/29/2026

City of Elgin·Illinois

63% match

Chicago Street Combined Sewer Separation Project

Closes 11/10/2026Opened 10/8/2026

City of Elgin·Illinois

63% match

Chicago Street Combined Sewer Separation Project

Closes 11/5/2026Opened 10/8/2026

City of Charlotte·North Carolina

63% match

Sewer Trunkline Modeling

Rolling / TBD closeOpened 7/1/2026

Connecticut City of Norwich·Connecticut

63% match

Cross connections and backflow

Closes 11/16/2026Opened 10/22/2026

City of Ketchikan·Alaska

63% match

26-21 Water Street Sewer Improvements Phase B - Hopkins Alley to Front Street

Closes 11/20/2026Opened 10/30/2026

Brazos Valley·Texas

63% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026