Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Oregon guideOregon Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oregon
  4. ›Construction
  5. ›Parkrose S.D. CM/GC Russell ES & Shaver ES Geothermal RFP

Oregon Parkrose School District·Oregon

Parkrose S.D. CM/GC Russell ES & Shaver ES Geothermal RFP

Closes 11/19/2026$500k – $1MRequest for Proposal
Get bids like this by emailBid source

Description

Parkrose School District is seeking a Construction‑Manager/General‑Contractor (CM/GC) to convert the heating systems at Russell and Shaver Elementary Schools from gas‑fired boilers to closed‑loop geothermal ground‑source heat‑pump systems. The contractor will provide full pre‑construction services (design reviews, constructability, risk analysis, permitting, subcontractor procurement, cost‑loaded schedule) and then execute the construction of vertical bore wellfields, loop‑field installation, building connections, ventilation upgrades, electrical integration, commissioning, and close‑out documentation. The scope includes compliance with PCEF equity and workforce requirements, extensive reporting, and performance/bond guarantees. The project is funded by a Portland Clean Energy Community Benefits grant and has a hard cap of $7.5 M for construction costs. • CM/GC services for two K‑12 school campuses (≈ 44k sf and 49k sf) – geothermal retrofit, vertical bore drilling, heat‑pump installation, and associated building upgrades. • Pre‑construction phase begins Dec 2026; substantial completion targeted Aug 2027 with a hard heating‑operational milestone of Oct 1 2027. • Contract type is cost‑of‑work + fee with a guaranteed maximum price; includes bond, insurance, and equity‑target obligations (30 % COBID‑certified, 20 % MBE/WBE/DBE). • Maximum allowable construction cost (MACC) $7.5 M; the owner’s grant $8.4 M covers the project, leaving the contractor fee as the primary revenue. • Mandatory compliance with Oregon prevailing‑wage rules, PCEF wage floor (≥ 180 % of minimum wage), and extensive reporting on workforce diversity and apprenticeship utilization.

Attached files

Contact

Robyn Stolin(Owner Project Manager)

[email protected]

(503) 408-2131

Key dates

Opened
10/30/2026
Questions due
11/10/2026
Pre-bid meeting
11/6/2026
Site visit
11/6/2026
Closes
11/19/2026
Projected award
12/11/2026
Duration
10 months

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
S-P26603-00018306

Budget estimate

$500,000 – $1,000,000

The MACC is $7.5 M; typical CM/GC fees range from 8 % to 15 % of construction cost. Assuming a 10 % fee plus anticipated change‑order recovery, the contractor’s earnings could fall between roughly $500,000 and $1,000,000. Factors influencing the range include the final GMP, the extent of early‑work packages, and performance‑based incentives or liquidated‑damage penalties.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Kenai Peninsula Borough·Alaska

Top match · 82%

Kenai Peninsula Borough – RFP 27‑010 “Kachemak Selo CMGC” – Construction Manager/General Contractor for New K‑12 School

Closes 11/19/2026Opened 10/14/2026

Massachusetts Greater Lawrence Technical School·Massachusetts

82% match

Mechanical Room Geothermal HVAC Installation

Closes 11/19/2026Opened 10/29/2026

Georgia DeKalb County Board of Education·Georgia

80% match

RFQu 27-752-819 CM at Risk Stoneview Elementary School Modernization

Closes 11/5/2026Opened 10/1/2026

North Carolina Department of Military & Veterans Affairs·North Carolina

80% match

North Carolina Department of Military & Veterans Affairs

Closes 11/24/2026Opened 10/28/2026

The Metropolitan Water District of Southern California·California

80% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/12/2026Opened 9/4/2026

DeKalb County School District·Georgia

80% match

CM at Risk Stoneview Elementary School Modernization

Closes 11/5/2026Opened 10/1/2026

The Oklahoma Purchasing System·Oklahoma

79% match

Geothermal

Closes 11/15/2026Opened 10/2/2026

DeKalb County School District·Georgia

79% match

CM at Risk Stoneview Elementary School Modernization

Closes 11/5/2026Opened 10/1/2026

University of Arkansas at Monticello·Arkansas

79% match

Request for Qualifications: General Contractors

Closes 11/5/2026Opened 10/17/2026

Michigan Forest Hills Public Schools·Michigan

79% match

RFP-Thornapple Elementary Mechanical Improvements

Closes 11/3/2026Opened 10/5/2026

DeKalb County School District·Georgia

79% match

CM at Risk Stoneview Elementary School Modernization

Closes 11/5/2026Opened 10/1/2026

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

79% match

BRONSON ANIMAL DISEASE DIAGNOSTIC LABORATORY BLDG 1000 EXPANSION - Construction Management Services

Closes 11/20/2026Opened 10/16/2026

Stockton Unified School District·California

78% match

RFQ/P #26-18 Washington Elementary School Site Improvement Project

Closes 11/18/2026Opened 10/24/2026

Georgia Cobb County Board of Education·Georgia

78% match

Russell ES Renovations, B27030

Closes 12/2/2026Opened 10/29/2026

St. Mary's County Public Schools·Maryland

78% match

Request for Qualifications and Invitation to Prequalify to Bid for Greenview Knolls Elementary School VRF System Replacement

Closes 11/19/2026Opened 10/29/2026

Georgia Wilkinson County Board of Education·Georgia

78% match

Advertisement for Proposals

Closes 11/12/2026Opened 10/16/2026

Georgia Atlanta Public Schools·Georgia

78% match

Atlanta Public Schools Booker T. Washington HS Renovations (Phase 1, GMP1)

Closes 11/17/2026Opened 10/30/2026

Rock Hill School District 3·South Carolina

78% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

Michigan Grand Rapids Public Schools·Michigan

78% match

GRPS Nutrition Center Roof Replacement

Closes 11/3/2026Opened 10/20/2026

San Gabriel Unified School District·California

78% match

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Michigan Memphis Community Schools·Michigan

78% match

District Wide Renovations

Closes 11/16/2026Opened 10/19/2026

San Gabriel Unified School District·California

78% match

San Gabriel USD - Roosevelt ES Playground - DIV 01

Rolling / TBD closeOpened 8/4/2026

City of Roseville·California

78% match

Roseville Electric Generation Division - Heat Exchange Maintenance

Closes 12/16/2026Opened 10/16/2026

Georgia Atlanta Public Schools·Georgia

78% match

27-092527-P-AR Guaranteed Energy Savings Performance Contract (GESPC)

Closes 11/23/2026Opened 10/12/2026