The U.S. Fish and Wildlife Service is seeking a contractor to replace a boiler at the Minnesota Big Stone WMD facility. The replacement boiler should be a high-efficiency model with a capacity to meet the facility's heating needs. The contractor will be responsible for removing the old boiler and installing the new one, as well as performing any necessary testing and commissioning.
Some key features of the replacement boiler include:
• High-efficiency rating (95% DOE AFUE efficiency)
• Modulating burner with up to 10:1 turndown
• Direct spark ignition
• Low NOx operation
• ASME stainless steel heat exchanger
• Top and bottom water connections
• Vertical and horizontal direct vent options
The contractor should have experience with boiler installation and maintenance, and should be able to provide a warranty for the new boiler.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.