Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Replace Granite Basin Water Booster Pumps & Tank Floats…

U.S. Department Of Agriculture·New Mexico

Replace Granite Basin Water Booster Pumps & Tank Floats, Prescott NF

Closes 9/14/2026$200k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The USDA Forest Service is seeking quotations from small‑business plumbing contractors to replace two water‑booster pumps, associated piping, and tank float assemblies at the Granite Basin Recreation Area on the Prescott National Forest. The new pumps must match the existing performance (approximately 42 GPM at a total dynamic head of 473 ft) and the system supplies potable water to day‑use visitors and campers. The work includes removal of existing equipment, installation of new pumps and plumbing, and disinfection of the system prior to startup. No third‑party commissioning is required. This is a total small‑business set‑aside under NAICS 238220. • Replace two 42 GPM booster pumps (same performance as existing units) • Install new plumbing and associated fittings to service a 15,600‑gallon storage tank located ~1 mile from the City of Prescott water source • Replace tank float mechanisms on the water storage tanks • Perform system disinfection before installation (water is pre‑chlorinated by the city) • Provide all labor, materials, and equipment; no third‑party commissioning required • Must submit a quotation; no separate solicitation will be issued.

Attached files

Contact

Richard Ortega(Contract Specialist)

[email protected]

(520) 848-2068

Key dates

Opened
8/14/2026
Questions due
9/7/2026
Pre-bid meeting
8/18/2026
Site visit
8/18/2026
Closes
9/14/2026
Duration
90 calendar days

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238220
Solicitation №
127EAX26Q0078

Budget estimate

$200,000 – $500,000

Based on typical costs for replacing two 42 GPM booster pumps, associated piping, and tank float assemblies on a small‑scale water system, a small‑business contractor can expect a contract value in the low‑to‑mid six‑figure range. Materials (pumps, pipes, fittings) likely run $100‑$150 k, labor and mobilization $80‑$200 k, and ancillary costs (disinfection, testing, travel) $20‑$50 k. Therefore a reasonable estimate is roughly $200,000 to $500,000, depending on the contractor’s pricing structure and any optional upgrades.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Fort Myers·Florida

Top match · 70%

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

City of Branson·Missouri

68% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

City of Worcester·Massachusetts

68% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

Clark County Country Water Facilities·Arkansas

68% match

Advertisement for Bids – Rehabilitation of Two Booster Pump Stations

Closes 11/18/2026Opened 10/18/2026

Upper Occoquan Service Authority·Virginia

68% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

State University of New York (SUNY)·New York

67% match

Replace Select Catch Basins

Closes 11/10/2026Opened 10/15/2026

U.S. Department Of Defense·Oregon

66% match

Bonneville Powerhouse II Unwatering Pump Replacement

Closes 8/21/2027Opened 8/21/2026

U.P. Engineers & Architects, Inc·Michigan

66% match

Adams Township Water Tank

Closes 11/24/2026Opened 10/30/2026

Massachusetts City of Worcester·Massachusetts

66% match

Water Booster Pump Skid Replacement / DPW

Closes 11/25/2026Opened 10/20/2026

City of San Diego·California

66% match

Pump Station 2 Improvements and Modernization (Advertisement Only : No BIDS)

Closes 12/10/2026Opened 10/28/2026

City of Hickman, Nebraska·Nebraska

66% match

Hickman NE Reservoir and Pump Station

Closes 11/9/2026Opened 10/9/2026

City of Neptune Beach·Florida

66% match

Water Treatment Plant Ground Storage Reservoir Rehabilitation

Closes 11/9/2026Opened 10/2/2026

City of Camden·South Carolina

65% match

Cool Springs Pump Station Replacement

Closes 11/18/2026Opened 10/19/2026

West County Wastewater·California

65% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

City of Alexandria·Louisiana

65% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

Santa Clara Valley Water District·California

65% match

Pacheco Pumping Plant Pump 12 Rebuild

Closes 12/8/2026Opened 10/20/2026

City of Charlotte·North Carolina

65% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

City of Douglas WY·Wyoming

65% match

SWM #1 - Surge Tank Replacement Project

Closes 11/10/2026Opened 10/23/2026