Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Greenhouse Cooling System Replacement 2026

Coastal Carolina University·South Carolina

Greenhouse Cooling System Replacement 2026

Closes 6/9/2026$50k – $150kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The university is seeking a contractor to replace its existing evaporative cooling system in the campus greenhouse. The work includes complete removal of the current 28‑foot‑wide by 48‑inch‑tall system, disposal, and installation of a new Lubing evaporative cooling unit with all necessary structural framing, PVC reservoir, drip collection, aluminum pads, support brackets, and a pump‑equipped tank. The contractor must provide all labor, materials, and accessories required to deliver a fully functional cooling system that meets the university’s specifications. • Remove existing evaporative cooling equipment and associated framing. • Supply and install new Lubing evaporative cooling system, including stringers, framing, 8” PVC reservoir, drip collector, aluminum pad retainers, support brackets, and pump‑tank assembly. • Coordinate with university facilities to ensure minimal disruption to greenhouse operations and comply with all safety and environmental standards.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Mark Avant(Agency Project Coordinator)

[email protected]

(843) 349-2152

Key dates

Opened
5/27/2026
Closes
6/9/2026

Last updated

Details

Type
Request for Quotation
Industry
Construction
NAICS
238220
Solicitation №
H17-GHCS-MA

Budget estimate

$50,000 – $150,000

Based on typical costs for greenhouse HVAC replacements, labor rates for specialized HVAC contractors, and the material list (new evaporative system, PVC reservoir, pumps, brackets, and framing), a reasonable estimate would fall between $50,000 and $150,000. The lower end assumes minimal site complications and standard material pricing; the higher end accounts for premium equipment, extended labor hours, and any additional site‑specific engineering work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 72%

47690 HVAC – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

NYS OGS Design & Construction - Construction Contractors·New York

71% match

Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Trident Technical College·South Carolina

69% match

TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**

Closes 11/5/2026Opened 10/13/2026

NYS OGS Design & Construction - Construction Contractors·New York

69% match

47690 ELECTRICAL – Replace Chiller System, Knight Hall & Dorms

Closes 12/9/2026Opened 10/27/2026

Trident Technical College·South Carolina

69% match

TTC - Palmer Campus Chiller Replacement **REVISION 2**

Closes 11/5/2026Opened 10/16/2026

Monroe County School District, FL·Florida

69% match

ITB 2026023 - AC Repairs and Replacements

Closes 11/19/2026Opened 10/22/2026

University of South Carolina·South Carolina

69% match

Chiller and Infrastructure Replacement-North Energy Plant Chiller#2

Closes 11/4/2026Opened 10/5/2026

San Gabriel Unified School District·California

68% match

2026-Bid-SG-04 Plans Gabrielino HS HVAC Replacement

Rolling / TBD closeOpened 10/3/2026

Memphis-Shelby County Schools·Tennessee

68% match

RFP 110226JKG HVAC Replacements 5 Locations

Closes 11/2/2026Opened 10/2/2026

City of Orangeburg·South Carolina

67% match

HVAC System Replacement for North Road Recreation Complex

Closes 11/6/2026Opened 10/6/2026

Rock Hill School District 3·South Carolina

67% match

Mt. Gallant Chiller Replacement

Closes 11/19/2026Opened 10/20/2026

City of Dublin·Ohio

67% match

Golf Center at SportsOhio — Infrared Tube Heater Replacement Project

Closes 11/23/2026Opened 10/23/2026

Department of Corrections·South Carolina

66% match

Security and Maintenance Upgrades - HVAC, Chiller and Kitchen Boiler Replacement - Headquarters - Replace Air Handlers

Closes 11/17/2026Opened 10/14/2026

The Ohio State University·Ohio

66% match

OSU-265784, Ross Heart Hospital - Low Temperature Chiller Replacement

Closes 11/18/2026Opened 10/28/2026

UCLA Capital Programs·California

66% match

Cogeneration Plant New Electric Chiller (PREQUALIFICATION)

Closes 11/5/2026Opened 10/21/2026

University of South Carolina·South Carolina

66% match

Chiller and Infrastructure Replacement- North E #2

Closes 11/4/2026Opened 9/26/2026

University of Missouri-Kansas City·Missouri

66% match

Dental School Chiller Replacement (KC664601)

Closes 11/12/2026Opened 10/29/2026

Rialto Unified School District·California

66% match

Carter HVAC Replacement

Closes 12/1/2026Opened 10/28/2026

Manhattan-Ogden Schools USD 383·Kansas

66% match

USD 383 Theodore Roosevelt and Bluemont HVAC Replacement

Closes 11/4/2026Opened 10/16/2026

U.S. Department Of Commerce·Arizona

66% match

J--HVAC Unit Replacement

Closes 11/20/2026Opened 10/23/2026

Mississippi State University·Mississippi

66% match

Trane Condenser, Evaporator Coil & TXV Replacement

Closes 11/3/2026Opened 10/14/2026

City of Apple Valley·Minnesota

66% match

APPLE VALLEY MUNICIPAL CENTER RTU REPLACEMENT

Closes 11/4/2026Opened 10/16/2026

University of Massachusetts·Massachusetts

66% match

Efficiency Review of Chiller Plants Operation & Maintenance

Closes 11/13/2026Opened 10/16/2026