Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›E-6B High Frequency (HF) Modernization

U.S. Department Of Defense·Maryland

E-6B High Frequency (HF) Modernization

Closes 5/1/2026$1M – $10MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Naval Air Systems Command (NAVAIR) intends to award a Cost Plus Fixed Fee (CPFF) sole source Delivery Order (DO) under the existing Basic Ordering Agreement (BOA) N0001924G0017 to Rockwell Collins, Inc. (Cage Code, 13499) doing business as (dba) Collins Aerospace Government Systems Division (Collins Aerospace) for non-recurring engineering for the integration of a Wideband High Frequency (WBHF) radio suite onto the E-6B aircraft. This effort will include development of an integration technical data package (TDP), System Integration Lab (SIL) installation and testing for risk reduction, validation and verification installations, procurement of A-kits, B-kits, spares, and training. • The WBHF system is to be integrated onto the E-6B aircraft. • The integration will include development of an integration technical data package (TDP). • The integration will include System Integration Lab (SIL) installation and testing for risk reduction. • The integration will include validation and verification installations. • The integration will include procurement of A-kits, B-kits, spares, and training.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

David T. Guy

[email protected]

Key dates

Opened
5/1/2026
Closes
5/1/2026

Last updated

Details

Type
Sole Source
Industry
Aerospace and Defense
NAICS
541330
Solicitation №
N00019-26-RFPREQ-APM271-0081

Budget estimate

$1,000,000 – $10,000,000

The budget for this contract is not explicitly mentioned in the document. However, considering the scope of the project, which includes non-recurring engineering for the integration of a Wideband High Frequency (WBHF) radio suite onto the E-6B aircraft, the budget could be substantial. The contract is a Cost Plus Fixed Fee (CPFF) contract, which means that the contractor will be reimbursed for their actual costs plus a fixed fee. The budget could be influenced by factors such as the complexity of the integration, the number of personnel required, and the duration of the project. A rough estimate for the budget could be in the range of $1 million to $10 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Florida

Top match · 63%

Market Intelligence - Progressive Design-Build - SRM Campaign for the 96th Medical Group

Closes 11/12/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

62% match

Electric Modernization Upgrade

Closes 12/1/2026Opened 8/20/2026

U.S. Department Of Defense·United States of America

62% match

E-6B Mission Computer Modernization (MCM) Software Licenses for Fiscal Year (FY) 27 and FY 28

Closes 11/6/2026Opened 10/22/2026

U.S. Department Of Defense·Florida

62% match

Planned Maintenance Interval (PMI) for E-6B

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Florida

62% match

FIRE APPARATUS INTERCOM SYSTEM UPLIFT AND INSTALLATION

Closes 9/4/2027Opened 8/24/2026

U.S. Department Of Defense·United States of America

61% match

59--CONVERTER,FREQUENCY, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

61% match

59--CONVERTER,FREQUENCY, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 10/19/2026

U.S. Department Of Defense·Utah

61% match

RFI - TURNKEY INDUSTRIAL PLANT SYSTEMS & SUPPORT (TIPSS) (HAFB)

Closes 11/24/2026Opened 10/21/2026

U.S. Department Of Defense·Massachusetts

61% match

Hanscom Aero Club Automated Fuel Management System Replacement

Closes 11/6/2026Opened 10/16/2026

U.S. Department Of Defense·Utah

60% match

Legacy Attitude Heading & Reference System (AHRS) Component Replacements – Low-cost Avionics Modernization Program II (LAMP II)

Closes 11/3/2026Opened 7/23/2026

U.S. Department Of Homeland Security·North Carolina

60% match

U.S. Coast Guard H-60T Maintainer Training Unit and Hot Mock Up Training Devices

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

60% match

Army Enterprise HVAC Modernization and Lifecycle Sustainment Maintenance

Closes 11/30/2026Opened 10/22/2026

U.S. Department Of Defense·Alaska

60% match

(EAR048) Repair Fire Alarm System Eareckson Air Station Facilities

Closes 11/16/2026Opened 10/26/2026

U.S. Department Of Defense·Georgia

60% match

Radio Frequency Calibration Backplane Assembly (RFCBA)

Closes 11/30/2026Opened 6/24/2026

U.S. Department Of Defense·Utah

60% match

Legacy Attitude Heading & Reference System (AHRS) Component Replacements – Low-cost Avionics Modernization Program II (LAMP II)

Closes 11/3/2026Opened 7/23/2026

U.S. Department Of Defense·United States of America

60% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026

U.S. Department Of Defense·Maryland

60% match

C2 Cross Functional Team (CFT) Broad Agency Announcement

Closes 3/23/2030Opened 3/24/2025

U.S. Department Of Defense·Ohio

60% match

Request for Information (RFI) – Modular Tactical Signals Intelligence (SIGINT) EW System

Closes 11/18/2026Opened 10/19/2026

U.S. Department Of Defense·Ohio

59% match

Repair Electrical Systems

Closes 11/12/2026Opened 10/1/2026

City of Alhambra·California

59% match

N2M26-20 CITY HALL ENERGY MANAGEMENT SYSTEM HVAC CONTROLS RETROFIT AND UPGRADE

Closes 11/12/2026Opened 10/20/2026

U.S. Department Of The Interior·United States of America

59% match

66--tTEM V2 SYSTEM UPGRADE

Closes 11/5/2026Opened 10/22/2026

U.S. Department Of Energy·California

59% match

UPDATED ALS SHB pulsed RF HPA

Closes 11/18/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

59% match

N0001927R1025 E-6B Mercury Depot Maintenance Repair and Overhaul (MRO): Request for Proposal (RFP)

Closes 12/11/2026Opened 10/27/2026

U.S. Department Of Defense·Ohio

59% match

High-Precision Wavemeter

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·Alabama

59% match

Overhaul of the UH-60 POWER TURBINE MODULE

Closes 11/30/2026Opened 9/30/2026