Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Laser Interferometer Space Antenna (LISA) Frequency…

National Aeronautics And Space Administration·Maryland

Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) Flight

Closes 9/19/2026$50M – $150MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

NASA Goddard Space Flight Center is seeking a sole‑source contractor (BAE Systems Space & Mission Systems) to design, fabricate, qualify, and deliver the Laser Interferometer Space Antenna (LISA) Frequency Reference System (FRS) hardware. The effort includes three flight models and one spare, each comprising an optical reference cavity (FRS‑O) and frequency‑locking electronics (FRS‑E). Deliveries are scheduled between February 2029 and May 2030, with minimal post‑delivery support. The contractor must provide full lifecycle services: design, analysis, manufacturing, integration, environmental testing (TVAC, vibration, EMI/EMC), documentation, and remote post‑delivery assistance. All work must comply with NASA, ESA, and aerospace standards (e.g., AS9100, ECSS, MIL‑PRF) and be delivered under a firm‑fixed‑price production contract (CLIN 0002) and a development CLIN (0001) for engineering and support. • Design, develop, and fabricate 3 flight FRS units + 1 spare (optics + electronics). • Perform qualification, verification, and environmental testing per NASA/ESA requirements. • Deliver hardware on strict schedule: FM‑1 (Feb 9 2029), FM‑2 (Sep 4 2029), FM‑3 (Mar 11 2030), Spare (May 31 2030). • Provide packaging, handling, transport, and limited post‑delivery technical support. • Submit capabilities/qualifications by Sep 19 2026 to be considered for a potential sole‑source award.

Attached files

Contact

Stefan Flessa(Primary Contact)

[email protected]

Key dates

Opened
7/16/2026
Closes
9/19/2026
Duration
4 years

Last updated

Details

Type
Request for Information
Industry
Aerospace and Defense
NAICS
336414
Solicitation №
NASA-GSFC-LISA-FRS-FLIGHT

Budget estimate

$50,000,000 – $150,000,000

The contract involves development, production, testing, and delivery of four high‑performance spaceflight units, plus associated engineering, documentation, and post‑delivery support. Similar NASA flight‑hardware programs (e.g., GRACE‑Follow‑On, LISA Pathfinder subsystems) have historically ranged from $50 M to $150 M depending on complexity, heritage, and schedule pressure. The aggressive delivery timeline (≈15 months of hardware production) and the need for custom long‑lead optics and electronics push the estimate toward the higher end of that range. Therefore a reasonable ballpark is $50 M – $150 M total contract value.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

National Aeronautics And Space Administration·United States of America

Top match · 67%

Integration and flight support for EXoplanet Climate Infrared TElescope (EXCITE) Balloon Mission Gondola System science flight.

Closes 11/2/2026Opened 10/28/2026

U.S. Department Of Commerce·Maryland

66% match

Sources Sought Notice for Mid-IR Optical Frequency Comb

Closes 12/3/2026Opened 11/19/2025

National Aeronautics And Space Administration·United States of America

65% match

System Vicarious Calibration (SVC) of the NASA Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) Ocean Color Instrument (OCI) Using HyperNAV

Closes 11/2/2026Opened 10/16/2026

U.S. Department Of Energy·Ohio

65% match

TECHNOLOGY LICENSING OPPORTUNITY: LiSA (Lithium Sensing with Advanced Polymer Systems)

Closes 12/6/2026Opened 6/5/2026

U.S. Department Of Agriculture·Maryland

64% match

Table-Top Free Space Measuring System - USDA-ARS Auburn AL

Closes 12/22/2026Opened 12/15/2025

National Aeronautics And Space Administration·United States of America

64% match

TECHNOLOGY TRANSFER OPPORTUNITY: Lightweight, Self-Deployable Helical Antenna (MFS-TOPS-113)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·New Mexico

64% match

Air Force Research Laboratory (AFRL) Request for Information for High Hypersonic Reentry Flight Experiment Program

Closes 4/30/2027Opened 4/27/2026

National Aeronautics And Space Administration·Alabama

64% match

TECHNOLOGY TRANSFER LICENSING OPPORTUNITY: Agile RFID Antenna System (MSC-TOPS-79)

Closes 2/27/2027Opened 3/23/2026

National Aeronautics And Space Administration·United States of America

64% match

TECHNOLOGY TRANSFER OPPORTUNITY: Space Link Extension Return Channel Frames (SLE-RCF) Software Library (GSC-TOPS-72)

Closes 8/24/2027Opened 8/24/2026

National Aeronautics And Space Administration·Alabama

63% match

TECHNOLOGY TRANSFER OPPORTUNITY: Lightweight, Self-Deployable Helical Antenna (MFS-TOPS-113)

Closes 8/10/2027Opened 8/10/2026

U.S. Department Of Defense·Georgia

63% match

Radio Frequency Calibration Backplane Assembly (RFCBA)

Closes 11/30/2026Opened 6/24/2026

U.S. Department Of Defense·Ohio

63% match

Intent to Sole Source: AFIT - High Finesse WS8-2 Wavemeter

Closes 11/6/2026Opened 10/23/2026

U.S. Department Of Defense·California

63% match

Keysight Network Analyzer

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·New Mexico

62% match

SPACE TECHNOLOGY ADVANCED RESEARCH-FAST-TRACKING INNOVATIVE SOFTWARE AND HARDWARE (STAR-FISH) ADVANCED RESEARCH ANNOUNCEMENT (ARA) WITH CALLS

Closes 3/22/2030Opened 2/16/2023

U.S. Department Of Defense·Ohio

62% match

High-Precision Wavemeter

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·New Mexico

62% match

Space Environment Technologies and Science (SETS) Broad Agency Announcement (BAA) Call 004

Closes 11/13/2026Opened 12/18/2023

U.S. Department Of Defense·Ohio

62% match

Multi-Spectral Sensing Technologies Research and Development (MUSTER)

Closes 1/20/2027Opened 2/9/2023

U.S. Department Of Defense·District of Columbia

62% match

INFRARED TELESCOPE AND ACCESSORIES

Closes 11/2/2026Opened 10/30/2026

U.S. Department Of Defense·California

62% match

58--LASER-INFRARED OBSERVA

Closes 11/1/2026Opened 10/25/2026

National Aeronautics And Space Administration·United States of America

62% match

TECHNOLOGY TRANSFER OPPORTUNITY: System for Flight Control of Extremely Fast (Hypersonic) Aircraft (LAR-TOPS-363)

Closes 8/10/2027Opened 8/10/2026

National Aeronautics And Space Administration·Mississippi

62% match

Keyence VHX-X1 Digital Microscope

Closes 11/3/2026Opened 10/30/2026

National Aeronautics And Space Administration·United States of America

62% match

TECHNOLOGY TRANSFER OPPORTUNITY: Smart Enclosure using RFID for Inventory Tracking (MSC-TOPS-72)

Closes 8/10/2027Opened 8/10/2026

National Aeronautics And Space Administration·Texas

62% match

Research Opportunities for International Space Station (ISS) Utilization

Closes 9/30/2030Opened 4/8/2026

U.S. Department Of Defense·Virginia

62% match

Firefox

Closes 11/9/2026Opened 9/16/2026

National Aeronautics And Space Administration·Maryland

62% match

VASI TECHNICAL SUPPORT

Closes 11/2/2026Opened 10/29/2026