Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›MCEC BALLROOM CARPET REPLACEMENT (T47)

Massachusetts Convention Center Authority·Massachusetts

MCEC BALLROOM CARPET REPLACEMENT (T47)

Closes 9/30/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Contractor shall provide all labor, equipment, and supervision for the carpet replacement at the MCEC Ballroom. The scope requires the removal and recycling of existing carpets and pads down to the substrate. The Contractor must grind or fill floors to eliminate adhesive residue and ensure a level surface. The Contractor shall install Owner-furnished carpet and adhesives using the direct glue-down method. Responsibilities include furnishing transition strips, primers, and necessary accessories. This contract covers all temporary protection, cleanup, and miscellaneous costs. Any subsequent additional areas requested by the Owner shall be performed under stipulated unit prices. Work is intended to occur during a defined facility closure. Dark Days at MCEC are scheduled for: December 18, 2026 – January 15, 2026. This is considered the period of performance to replace carpet onsite. All overtime and shift-related expenses must be factored into the initial bid price, as no additional compensation claims will be accepted. The Contractor shall utilize night shifts (or overtime) as necessary to meet the strict completion deadline. Operations must accommodate safety regulations, event schedules, site access limits, and emergency egress rules. Required shift work or overtime shall not be grounds for additional compensation claims. The Carpet is Owner-Supplied. The area of Ballroom is approximately 60,200 square feet.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
9/2/2026
Closes
9/30/2026

Last updated

Details

Industry
Construction
NAICS
238310

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Melbourne Airport Authority·Florida

Top match · 65%

Carpet Replacement

Closes 12/2/2026Opened 9/29/2026

Hawaii Department of Human Resources Development·Hawaii

62% match

12th and 13th Floor Carpet Tile Replacement

Closes 11/16/2026Opened 10/1/2026

Horry Georgetown Technical College·South Carolina

62% match

Carpet Replacement - Conway Campus Building 100 1st Floor

Closes 11/24/2026Opened 10/29/2026

U.S. Department Of The Interior·Montana

61% match

MT BFTC CARPET REPLACEMENT CONFERENCE ROOM

Closes 11/13/2026Opened 10/27/2026

U.S. General Services Administration·District of Columbia

61% match

Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements

Closes 11/11/2026Opened 10/1/2026

Fox Valley Technical College·Wisconsin

61% match

Flooring Replacement – AG137 - REBID

Closes 11/13/2026Opened 10/30/2026

Southeast Missouri State University·Missouri

61% match

IFB 6044 - Carpet

Closes 11/16/2026Opened 10/22/2026

U.S. Department Of Veterans Affairs·Texas

60% match

Flooring Replacement Services CTXVA

Closes 11/25/2026Opened 10/28/2026

U.S. Department Of Veterans Affairs·California

60% match

Z2DA--612A4-27-018 | Replace B650 3rd and 2nd Flooring

Closes 11/12/2026Opened 10/13/2026

City of Lincoln·Nebraska

60% match

Carpet Enhancements for Pinnacle Bank Arena

Closes 11/4/2026Opened 10/21/2026

University of Southern Mississippi·Mississippi

60% match

Joseph Anderson Cook Memorial Library Third‑Floor Carpeting

Closes 11/17/2026Opened 10/14/2026

Washtenaw Community College·Michigan

59% match

Bid - SC Welcome Center Flooring Replacement

Closes 11/16/2026Opened 10/26/2026

U.S. General Services Administration·District of Columbia

59% match

Design Build Markey DC0094ZZ Multi Floor Interior Finish Improvements

Closes 11/11/2026Opened 10/1/2026

U.S. Department Of Veterans Affairs·California

59% match

FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020

Closes 11/17/2026Opened 10/19/2026

Illinois DHS - Human Services·Illinois

59% match

DHS IFB AMHC AFC Carpet Removal and Epoxy Flooring Install

Closes 11/5/2026Opened 10/16/2026

Alabama Office of the Chief Procurement Officer·Alabama

59% match

Carpet

Closes 11/12/2026Opened 10/20/2026

California Department of Veterans Affairs·California

59% match

25HS0024 - NCVC Flooring Replacement Service

Closes 11/16/2026Opened 10/2/2026

Columbus Consolidated Government·Georgia

59% match

CARPET (Annual Contract)

Closes 11/18/2026Opened 10/16/2026