The City of Tacoma is seeking a contractor to install one complete cathodic protection impressed current system for the Enumclaw Pipeline 1. The system shall include a deep well anode groundbed, rectifier, utility power service, test station, anode shunt box, service disconnect, equipment pedestal, conduit, wiring, trenching, backfill material, surface restoration, and other necessary materials and permits. The contractor will also be responsible for removing and disposing of the existing power pole, rectifier, and associated equipment. The contract term is expected to be approximately 6 months, with an anticipated completion date before the end of May 2026. Key considerations for the contractor include compliance with prevailing wage laws, provision of insurance coverage, and adherence to the City's standard terms and conditions.
• The contractor must have the necessary experience, stability, organization, and technical qualifications to perform the proposed contract.
• The contractor must be able to comply with the required performance schedule and have a satisfactory record of performance, integrity, judgment, and skills.
• The contractor must be otherwise qualified and eligible to receive an award under applicable laws and regulations.
• The contractor must provide proof of and maintain insurance coverage in the amounts and manner specified in the City of Tacoma Insurance Requirements.
• The contractor must ensure that no worker, laborer, or mechanic employed in the performance of any part of the contract shall be paid less than the prevailing rate of wage specified.