Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›2026 Dixon Water Treatment Plant Reduced-Pressure Zone…

Onslow Water and Sewer Authority·North Carolina

2026 Dixon Water Treatment Plant Reduced-Pressure Zone Replacement RFB

Closes 1/21/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Onslow Water & Sewer Authority is seeking bids for the removal and replacement of the existing 8” diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing at the Dixon Water Treatment Plant. The project includes the installation of new valves, piping, and plumbing, as well as the testing and start-up of the new system. The contractor will be responsible for providing all labor, equipment, and materials necessary to complete the project. The bid must be submitted on the Bid Pricing Form provided, and the contractor must meet the requirements outlined in the Scope of Work and the ONWASA Standard Contract Language. • The project requires the contractor to have experience with similar contracts and to provide a list of equipment and certified workers. • The contractor must comply with all applicable laws and regulations and maintain the necessary insurance coverage. • The project includes a mandatory site visit and a pre-bid meeting. • The contractor must submit a bid that includes all costs, including labor, materials, and permits. • The bid must be signed by an officer or officers authorized to execute legal documents on behalf of the contractor.

Attached files

Contact

Eric Adams(Chief Financial Officer)

[email protected]

(910) 937-7545

Key dates

Opened
1/6/2026
Pre-bid meeting
1/14/2026Mandatory
Site visit
1/14/2026Mandatory
Closes
1/21/2026
Duration
45 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2026 Dixon Water Treatment Plant Reduced-Pressure Zone Replacement

Budget estimate

$200,000 – $500,000

Based on the scope of work, which includes the removal and replacement of the existing 8” diameter reduced-pressure zone with pressure relief valve, gate valves, pressure reducing valves, automatic control valve, and associated plumbing, the estimated budget could be in the range of $200,000 to $500,000. This estimate is based on industry standards for similar projects and takes into account the cost of labor, materials, and equipment required to complete the project. Factors that may influence the likely payment range include the complexity of the project, the experience and qualifications of the contractor, and the availability of materials and equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Upper Occoquan Service Authority·Virginia

Top match · 73%

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

Town of Jupiter·Florida

71% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

71% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026

City of Branson·Missouri

71% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

New York City Department of Environmental Protection·New York

70% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

Dickenson County·Virginia

70% match

Dickenson County Public Service Authority Haysi Wastewater Treatment Plant

Closes 11/16/2026Opened 9/30/2026

Town of Tyrone·Georgia

70% match

2026 Generator Replacement Sewer Pump Station #3

Closes 11/4/2026Opened 10/5/2026

New York City Department of Environmental Protection·New York

70% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

Oregon Clackamas County·Oregon

69% match

BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements

Closes 11/17/2026Opened 10/7/2026

Northern Virginia Parks·Virginia

69% match

Brambleton Golf Course - Replacement of Irrigation Pumping Plant

Closes 11/9/2026Opened 10/9/2026

City of San Diego·California

69% match

Otay WTP Raw Water PS Switchboard Replacement - ADVERTISEMENT ONLY

Closes 12/8/2026Opened 10/28/2026

City of Plano·Texas

69% match

RFB Haggard Pond Restoration | Project No. PKR-D-00013

Closes 11/2/2026Opened 9/21/2026

City of Farmers Branch·Texas

69% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of Riverside·California

69% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Harrisonburg·Virginia

69% match

Water Treatment Plant Sedimentation Basin Plate Settlers Project RFP (2027004-PU-DB)

Closes 12/10/2026Opened 10/6/2026

New York City Department of Environmental Protection·New York

69% match

82626B0054-BEDC-PS-318 Reconstruction of Paerdegat Pumping Station

Closes 12/16/2026Opened 10/21/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

69% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park (Electrical Contract)

Closes 12/3/2026Opened 10/28/2026

Central Contra Costa Sanitary District·California

69% match

RFP: Construction Management Services for the Ultraviolet Disinfection Replacement, District Project 100012 (RE-ISSUE)

Closes 11/13/2026Opened 10/13/2026