This solicitation calls for a multi‑year, on‑demand contract to demolish existing synthetic‑turf fields, prepare the site, and install new dual‑fiber turf systems, goal‑systems, and related infrastructure for Gwinnett County’s Parks and Recreation Department. The contractor must provide complete demolition, laser grading, drainage correction, turf installation, infill, field markings, testing, warranty support, and close‑out documentation, with optional renewal for up to three calendar years. The award will be based on the lowest responsive and responsible bid; bonds and extensive insurance are required.
• Scope includes full field demolition, base preparation, dual‑fiber turf installation, goal‑system installation, and post‑installation performance testing.
• Mandatory qualifications: ≥ 3 public‑agency turf installations, ASBA Certified Field Builder, Georgia‑based representative, $1.5 M performance/payment bonds, 5 % bid bond, and required insurance limits.
• Contract period: Jan 1 2027 – Dec 31 2027 with automatic one‑year renewals up to a three‑year total lifetime, subject to 60‑day termination window.