Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Hampshire guideNew Hampshire Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Hampshire
  4. ›Construction
  5. ›Bridge Approach Construction and Bridge Installation

New Hampshire Department of Natural and Cultural Resources·New Hampshire

Bridge Approach Construction and Bridge Installation

Closes 3/5/2026$500k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The State of New Hampshire, Department of Natural and Cultural Resources, is seeking bids for the construction of bridge approaches and the installation of two pre-fabricated bridges on the Corridor 19 Snowmobile Trail in Chatham, NH. The project involves the construction of site-specific approaches and abutments using engineered design plans, as well as the installation of two pre-purchased, pre-fab modular bridges. The contractor will be required to coordinate with the bridge fabricator to deliver the bridges to the site when they are ready to be set in place. The project must be completed by August 25th, 2026. Key aspects of the project include: • Construction of approaches and abutments using engineered design plans • Installation of two pre-fabricated bridges • Coordination with the bridge fabricator for bridge delivery • Completion of the project by August 25th, 2026 • Mandatory pre-construction meeting before construction commences • A mandatory post-construction inspection will be performed by WMNF and DNCR personnel The contractor will be responsible for providing all necessary personnel, equipment, and materials to complete the project, and must ensure that all work is performed in accordance with the contract documents and applicable laws and regulations.

Attached files

Contact

Alexis Rudko, Craig Rennie(Trails Bureau Chief)

[email protected]

(603) 271-3254

Key dates

Opened
1/20/2026
Closes
3/5/2026
Duration
154 days, from the estimated start date in Spring 2026 to the completion date of August 25th, 2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
RFB DNCR 2026-10

Budget estimate

$500,000 – $1,500,000

The budget for this project can be estimated based on the scope of work and the requirements of the contract. The contract price will be determined by the bids received, but the state has allocated $10,000 for unforeseen conditions. The total budget will depend on the complexity of the project, the materials and labor required, and the contractor's overhead and profit. A rough estimate for the budget could be between $500,000 and $1,500,000, considering the construction of two bridges and the approaches, as well as the installation and other requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richmond·California

Top match · 69%

Richmond Greenway Bridge Project – Implementation Plan

Closes 11/19/2026Opened 10/19/2026

Connecticut Town of Cheshire·Connecticut

68% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

68% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

California Department of Transportation·California

68% match

Bridge overlay, approach slab, joint seal, HMA, and cold plane.

Closes 11/10/2026Opened 10/12/2026

City of Ormond Beach - Purchasing Office·Florida

67% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

County of Marin·California

67% match

MCP 2026-07 CASCADE CANYON TRAIL BRIDGE PROJECT

Closes 12/3/2026Opened 10/27/2026

City of Minot·North Carolina

66% match

RFQ: CITY BRIDGE REHABILITATION PROJECT 5060

Closes 11/20/2026Opened 10/30/2026

Sedgwick County·Kansas

66% match

Bridge Improvements (B515)

Closes 11/3/2026Opened 10/21/2026

City of St. Louis·Missouri

66% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Georgia Cobb County Department of Transportation·Georgia

66% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Cobb County, GA·Georgia

66% match

Engineering Design Services for Factory Shoals Pedestrian Bridge Phase 1

Closes 11/12/2026Opened 10/16/2026

Virginia Department of Transportation·Virginia

65% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Connecticut Town of Cheshire·Connecticut

65% match

2627-05 Mixville Park Pedestrian Bridge

Closes 11/3/2026Opened 10/13/2026

BREC·Louisiana

65% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Town of Camp Verde·Arizona

65% match

Park Verde Road Irrigation Crossing Improvements Project

Closes 11/3/2026Opened 10/8/2026

Oregon Department of Transportation·Oregon

65% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

City of Columbia·Missouri

65% match

Replacement of Bridge 9 on MKT Trail

Closes 11/10/2026Opened 9/29/2026

LA Public Works Engineering Bureau·California

65% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Charlotte·North Carolina

65% match

Bridge Repair Design

Rolling / TBD closeOpened 6/30/2028

Division of Highways·North Carolina

65% match

Replacement of Bridge 12 on State Road 1337, Cleveland County, NC

Closes 11/10/2026Opened 10/19/2026

Minnesota Department of Administration·Minnesota

65% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026

California Department of Transportation·California

65% match

Temp bridge, deck portion Repl, hang conduit, & polyester Conc overlay

Closes 11/4/2026Opened 9/28/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

65% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026

City of Fort Myers·Florida

65% match

John Yarbrough Linear Park (JYLP) Trail Construction from Colonial Blvd. to Hanson St. Rebid (Sun Trail 447515-1-54-01)

Closes 11/16/2026Opened 10/7/2026

Virginia Department of Transportation·Virginia

65% match

B34_2027 BRIDGE REHABILITATION

Closes 11/18/2026Opened 10/13/2026