Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Water and Wastewater
  5. ›Iron and Manganese Treatment at Well 31

City of Clovis·California

Iron and Manganese Treatment at Well 31

Closes 11/10/2026$800k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Clovis is seeking a qualified contractor to design, supply, install, test, and commission a 600‑gpm iron‑and‑manganese removal treatment system at an existing well (Well 31). Work includes extensive civil construction (excavation, grading, concrete pads, sewer‑manhole, backwash standpipe), mechanical installation of six‑vessel pressure filtration equipment, full low‑voltage electrical and PLC/SCADA controls, and comprehensive testing, commissioning, and operator training. The contract is a sealed‑bid, public‑works award with a 35‑working‑day construction schedule and liquidated damages of $1,000 per day for late performance. • Civil works: site grading, concrete vessel pads, sewer main (PVC SDR‑35), manhole, and backwash disposal infrastructure. • Mechanical/equipment: six self‑back‑washing pressure filter vessels, manganese‑dioxide media, valves, magnetic flowmeters, pressure gauges, and associated piping. • Electrical & controls: low‑voltage power distribution, PLC/SCADA system, instrumentation, and full integration testing. • Mandatory compliance: California Building Code, ASCE 7‑16 seismic/wind, ANSI/NSF 61 potable‑water certification, and required performance, payment, and bid bonds.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Carson Hatmaker

[email protected]

(559) 324-2606

Key dates

Opened
10/16/2026
Questions due
10/30/2026
Closes
11/10/2026
Duration
35 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
PUD 26-18

Budget estimate

$800,000 – $1,500,000

The solicitation does not disclose the total contract value; only a $50,000 mobilization base is listed. Based on comparable 600 gpm water‑treatment plant projects in California, civil works, filter‑vessel supply, electrical/controls, and commissioning typically range from $800 K to $1.5 M. The estimate accounts for material costs (filter vessels, media, steel pipe, concrete), labor, equipment mobilization, and required bonds/insurance.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Sacramento·California

Top match · 83%

Municipal Groundwater Well Drilling Contractors

Closes 11/19/2026Opened 10/29/2026

City of Melbourne·Florida

82% match

Above Grade Wells 5 & 6

Closes 11/4/2026Opened 9/28/2026

Western Municipal Water District·California

82% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

Connecticut City of Meriden·Connecticut

82% match

Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

City of Santa Rosa·California

81% match

Secondary Clarifier No 1 Rehabilitation Project

Closes 11/10/2026Opened 9/29/2026

City of Aurora, IL·Illinois

81% match

Well 115 Maintenance & Rehabilitation

Closes 11/18/2026Opened 10/29/2026

City of Rockford·Illinois

81% match

WELL 6 RESERVOIR REHAB

Closes 11/10/2026Opened 10/13/2026

City of Hollywood·Florida

81% match

Water Treatment Plant MS/RO Chemical Area Recoating; Project No. 25-4262A

Closes 12/3/2026Opened 10/26/2026

Florida Department of Agriculture and Consumer Services (FDACS)·Florida

81% match

BRONSON ANIMAL DISEASE DIAGNOSTIC LABORATORY BLDG 1000 EXPANSION - Construction Management Services

Closes 11/20/2026Opened 10/16/2026

City of Meriden·Connecticut

81% match

RFP027-33 Mule Well Rehabilitation

Closes 11/20/2026Opened 10/29/2026

City of Meriden·Connecticut

80% match

RFP027-34 Platt & Lincoln Well Rehabilitation

Closes 11/20/2026Opened 10/30/2026

City of Norwalk·California

80% match

Well No. 10 GAC Treatment and System Upgrades

Closes 11/10/2026Opened 10/6/2026

Massachusetts Town of Hull·Massachusetts

80% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

City of Carlsbad·California

80% match

Vista/Carlsbad Reach VC-2 Manhole Rehabilitation Project

Closes 11/2/2026Opened 10/21/2026

City of Riverside·California

80% match

WATER WELL REHABILITATION PROGRAM FY2026/2027

Closes 11/20/2026Opened 10/23/2026

City of Bakersfield·California

80% match

RFQ - Consulting Services for Water Well CBK-81 Construction and L-211 TCP & H2S Treatment

Closes 11/3/2026Opened 10/13/2026

City of Lincoln·Nebraska

80% match

Master Agreement for Hydro Excavation, Grease & Debris Removal and Pumping Services

Closes 7/22/2027Opened 7/21/2025

Pennsylvania Department of Environmental Protection·Pennsylvania

80% match

Abandoned Mine Drainage Abatement Project – Oven Run Site B (AFVFP Stone Cleaning) – Shade Township, Somerset County

Closes 11/19/2026Opened 10/23/2026

Town and County of Nantucket·Massachusetts

80% match

Well No. 17 Pump Station Project - GENERAL BIDS

Closes 12/9/2026Opened 10/28/2026

Massachusetts Town of Middleborough·Massachusetts

80% match

South Wells Water Treatment Facility, DWSRF# 19217, Contract ENG25-0918-Sub Prequal

Closes 11/13/2026Opened 10/14/2026

City of Casa Grande·Arizona

80% match

Manhole Rehabilitation

Closes 11/24/2026Opened 10/20/2026

California Department of General Services·California

80% match

CONTRACT NUMBER: 26-334792; AUGMENTATION OF ELECTRICAL SERVICE CAPACITY, DEPARTMENT OF STATE HOSPITALS, NAPA STATE HOSPITAL, NAPA, NAPA COUNTY, CALIFORNIA, PROJECT NUMBER: 14109

Closes 11/18/2026Opened 9/18/2026

California Department of General Services·California

80% match

CONTRACT NUMBER: 26-336714; SITE COMPLIANCE AND IMPROVEMENTS ¿ PATTON LANDING CALIFORNIA TAHOE CONSERVANCY CARNELIAN BAY, PLACER COUNTY, CALIFORNIA; PROJECT NUMBER: 13891

Closes 11/10/2026Opened 10/2/2026

City of Clearwater·Florida

80% match

Northeast Advanced Pollution Control Facility Install Generator Docking Station at Sand Filter and Reclaim Buildings

Closes 12/16/2026Opened 10/28/2026

The Metropolitan Water District of Southern California·California

79% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/12/2026Opened 9/4/2026