Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Civil Engineering
  5. ›Silver Queen Water Main Upgrades

Colorado Town of Breckenridge·Colorado

Silver Queen Water Main Upgrades

Closes 12/12/2025$1M – $5MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Breckenridge is seeking design consulting services to upgrade the water distribution main between the Silver Queen Tank and Main Street/Highway 9. The selected Consultant shall lead the project, including all design items associated with upgrading the water main through construction documents, and submit all design reports, plans, specifications, construction cost estimates, schedules, locations for required easements, and any other documentation required to construct the project. The design shall follow the Town of Breckenridge Engineering and Water Standards and Technical Specifications. • The project involves upgrading the existing water main to a 16-inch pipe, approximately 4,265 LF, and adding a new section of 16-inch pipe, approximately 613 LF. • The Consultant shall evaluate the existing bridge at the location where the existing water main crosses under the Blue River and determine if it can remain or needs to be replaced. • The project is expected to be a two-season project, and the Town would like to start construction as soon as possible. • The Consultant shall provide project management, coordination, and meetings, including a kick-off meeting, bi-weekly project meetings, and meeting agendas and minutes. • The Consultant shall perform field investigations, including geotechnical drilling, utility locates, and potholing, and provide design reports and recommendations. • The Consultant shall develop 30% and 90% construction plans and specifications, and final construction documents, and provide cost estimates and access and construction easements.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Aaron Neff

[email protected]

(970) 453-3174

Key dates

Opened
10/30/2025
Questions due
11/21/2025
Closes
12/12/2025
Projected award
1/1/2025

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
541330
Solicitation №
10302025

Budget estimate

$1,000,000 – $5,000,000

The budget for this project is likely to be in the range of $1 million to $5 million, based on the scope of work and the fact that it is a design consulting services project for a water main upgrade. The actual budget will depend on the proposal submitted by the selected Consultant and the negotiations with the Town of Breckenridge. Factors that may influence the likely payment range include the complexity of the project, the qualifications and experience of the Consultant, and the Town's budget for the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ontario·California

Top match · 65%

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Edgewater, FL·Florida

65% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

City of Charlotte·North Carolina

65% match

Fiscal Year 2026 Water Main Replacement

Rolling / TBD closeOpened 4/30/2026

Riverton City·Utah

64% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

Hastings Utilities·Nebraska

63% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

Riverton City·Utah

63% match

CC26-475 Main Water Tank Drainline Upgrade Project

Closes 11/17/2026Opened 10/30/2026

City of Charlotte·North Carolina

63% match

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

Upper Occoquan Service Authority·Virginia

62% match

UOSA IFB 27-02 P2NR+ Construction

Closes 11/4/2026Opened 8/24/2026

City of Bellevue·Washington

62% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of DeLand·Florida

62% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Oregon Tualatin Valley Water District·Oregon

62% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Salina·Kansas

61% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Riverside·California

61% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

Western Virginia Water Authority·Virginia

61% match

ITB - WYCLIFFE AVENUE WATERLINE REPLACEMENTS

Closes 12/2/2026Opened 10/23/2026

City of DeLand·Florida

61% match

2024 Downtown South Water Main Improvements-East Phase

Closes 11/17/2026Opened 10/13/2026

West County Wastewater·California

61% match

Secondary Sedimentation Basins Upgrades Project - Short-term Improvements for Basins (1) & (2)

Closes 12/16/2026Opened 10/27/2026

Northern Kentucky Water District·Kentucky

61% match

Amsterdam Road Water Main Replacement

Closes 1/31/2027Opened 10/13/2026

City of Alexandria·Louisiana

61% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

Clermont County - Board of Commissioners·Ohio

61% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026

St. Helena Parish Police Jury·Louisiana

61% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Arkansas

61% match

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

Santa Maria-Bonita School District·California

61% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

City of Charlotte·North Carolina

61% match

Mallard Connector Main

Rolling / TBD closeOpened 3/1/2027

Connecticut Town of Waterford·Connecticut

61% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

City of Lake City and City of Bellechester·Minnesota

60% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026