Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Civil Engineering
  5. ›Project Initiation Documents for the Eucalyptus Street…

City of Victorville·California

Project Initiation Documents for the Eucalyptus Street Extension over the Oro Grande Wash

Closes 7/16/2026$400k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Victorville is seeking a qualified civil engineering consulting firm to prepare a Project Initiation Document (PID) in the form of a Project Study Report–Project Development Support (PSR-PDS) for the proposed extension of Eucalyptus Street across the Oro Grande Wash. The selected Consultant will perform all necessary technical studies, analyses, coordination, and documentation required to prepare a PSR-PDS. The study will evaluate the feasibility of providing a new east-west transportation corridor connecting the Golden Triangle area to the existing and planned regional transportation network. The scope of work includes: introduction, existing conditions and background, purpose and need, alternatives analysis, traffic operations and regional circulation, system and regional planning, environmental considerations and permitting, hydrology, hydraulics, geotechnical, and drainage, right-of-way and utilities, cost estimates and implementation strategy, and funding and project development. The City has an allocated budget of approximately $500,000 for completion of the Scope of Services. • The Consultant shall prepare a PSR-PDS to evaluate the feasibility of providing a new east-west transportation corridor. • The study shall establish the project purpose and need, evaluate conceptual improvement alternatives, identify project constraints and implementation considerations, and develop the technical information necessary to support future environmental clearance, project programming, and state and federal funding opportunities. • The Consultant shall perform all necessary technical studies, analyses, coordination, and documentation required to prepare a PSR-PDS. • The City has an allocated budget of approximately $500,000 for completion of the Scope of Services. • The selected Consultant shall prepare a PSR-PDS within six (6) months from the City’s Notice to Proceed (NTP). • The Consultant shall identify any clarifications, assumptions, or conditions that may affect the proposed scope of services, schedule, level of effort, staffing, fee, or successful completion of the project.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ximena Zambrano(Assistant Engineer II)

[email protected]

(760) 955-8337

Key dates

Opened
6/10/2026
Questions due
6/29/2026
Pre-bid meeting
6/22/2026
Closes
7/16/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Civil Engineering
NAICS
54133
Solicitation №
MS26-125

Budget estimate

$400,000 – $500,000

Based on the allocated budget of approximately $500,000 for completion of the Scope of Services, the budget for this opportunity is estimated to be around $400,000 to $500,000. The factors that may influence the likely payment range include the complexity of the project, the level of expertise required, and the number of firms competing for the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

County of Fairfax·Virginia

Top match · 68%

Advertisement for Bid for the Little River Turnpike Walkway – Eastbound

Closes 11/30/2026Opened 10/30/2026

City of Charlotte·North Carolina

67% match

1206 Georgetown Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/15/2027

Cobb County·Georgia

67% match

Chattahoochee River Trail – FM SR 139 to Nickajack Creek – Phase II Public Notice of Advertisement

Closes 4/8/2027Opened 9/21/2026

County of San Luis Obispo·California

66% match

Vineyard Drive Corridor East Enhancements

Closes 11/5/2026Opened 10/15/2026

City of Charlotte·North Carolina

66% match

Pella Rd 6212 Project Storm Drainage Improvement Project

Rolling / TBD closeOpened 7/4/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

66% match

Ames Blvd. Lighting: From Lapalco Blvd. to Barataria Blvd

Closes 12/3/2026Opened 10/14/2026

City of Rancho Cordova·California

66% match

Rancho Cordova Complete Streets Implementation Guide

Closes 11/13/2026Opened 10/9/2026

City of Pawtucket·Rhode Island

66% match

Addendum No. 1 to RFP 27-008

Closes 1/14/2027Opened 7/21/2026

City of Flagstaff, AZ·Arizona

66% match

Professional Engineering Services for Lone Tree Road Feasibility Study, O'Leary St to J.W. Powell Blvd

Closes 11/12/2026Opened 9/25/2026

City of Pasadena·California

66% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Charlotte·North Carolina

66% match

Newell Stream Restoration Project

Rolling / TBD closeOpened 7/15/2026

Nevada Government·Nevada

66% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

County of Santa Cruz·California

65% match

Upper East Zayante PM 1.18 Storm Damage Repair Project

Closes 11/12/2026Opened 10/15/2026

CPPJ- Special Service Districts·Louisiana

65% match

Nelson Road Waterline Expansion Project

Closes 11/17/2026Opened 10/20/2026

City of Charlotte·North Carolina

65% match

McCullough Drive Extension

Rolling / TBD closeOpened 1/1/2026

City of Fresno·California

65% match

River West Fresno Eaton Trail Extension Phase 1

Closes 11/20/2026Opened 10/21/2026

City of Seattle·Washington

65% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

Town of Eatonville·Florida

65% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Muskogee·Oklahoma

65% match

Addendum 1 - HWY 165 Waterline Extension

Rolling / TBD closeOpened 9/16/2026

City of Charlotte·North Carolina

65% match

Shamrock Drive Complete Street

Rolling / TBD closeOpened 4/1/2027

Texas City of San Antonio·Texas

65% match

George Road Low Water Crossing (Hunters Bow to NW Military Highway)

Closes 11/3/2026Opened 9/25/2026

Neel-Schaffer, Inc·Mississippi

65% match

18766 Live Oak Avenue Drainage Improvements#21038

Closes 11/10/2026Opened 10/14/2026

Nevada Government·Nevada

65% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

City of Green Cove Springs·Florida

65% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Lavaca·Arkansas

65% match

West Birch Street Water System Improvements

Closes 11/5/2026Opened 10/11/2026