The TSA Training Academy, located within FLETC Glynco, requires comprehensive facility upgrades across its modular buildings. The project includes HVAC replacement, ceiling and canopy fan installation, steel door replacement, ADA ramp installation/modification, concrete work, and drainage improvements. The contractor will be responsible for performing the work in accordance with the scope of work and applicable laws and regulations.
• Replace 105 wall-mounted package HVAC units
• Install 134 ceiling fans and one 12-foot outdoor canopy fan
• Replace exterior doors with steel double doors
• Install ADA ramps at four buildings and modify one ramp
• Repair soft floor spots in two modular buildings
• Install ~6,000 sq. ft. of 4-inch concrete for the bleacher area under the canopy
• Clean trench drains adjacent to the canopy
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.