The City of Albany, Georgia is seeking a qualified contractor to install HDPE conduit and pull #1/0 15 kV primary wire for Phase 4 of its conduit and wire installation program. The contractor will provide all labor, equipment, supervision, and related services to install approximately 16,200 linear feet of 1‑2 in. HDPE conduit using directional‑bore techniques, install 2‑in. galvanized 90° elbows, and pull and terminate the primary wire at designated transformers. The City supplies all conduit, wire, and termination hardware; the contractor must secure permits, locate existing utilities, maintain traffic safety, and deliver a one‑year warranty. The contract is a lump‑sum, firm‑price award based on the lowest responsive and responsible bid, with required bid, performance, and payment bonds.
• Install 1‑2 in. HDPE conduit to a minimum depth of 3.5 ft, including directional‑bore work.
• Provide and install 2‑in. galvanized sweeping elbows and pull #1/0 15 kV wire through the conduit.
• Manage all site‑related logistics: utility locates, permits, traffic control, safety measures, and final inspection coordination.
• Deliver a one‑year labor warranty and adhere to $100 per day liquidated‑damages for schedule overruns.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.