This opportunity is a sealed‑bid, lump‑sum subcontract for the interior renovation of the Acosta Operations Center at UCLA, covering demolition, cold‑formed metal framing, gypsum board, acoustical ceiling, insulation, pipe‑grid, firestopping, and related finish work for approximately 2,321 asf of ground‑floor office space. The work will be performed under the supervision of Suffolk Construction, the CM/Contractor, and must comply with California prevailing‑wage and LEED‑ID+C requirements. Only six pre‑qualified subcontractors may submit bids.
• Scope includes cold‑formed metal framing, drywall, ceiling tiles, thermal insulation, and broadcast pipe‑grid system installation.
• Estimated subcontract value is $480,221, requiring a California B‑License and compliance with UC Fair Wage and LEED‑ID+C standards.
• Bidding timeline: documents available 9/2/2026, pre‑bid conference 9/8/2026 (optional), site walk 9/9/2026, RFI deadline 9/15/2026, bid submission 10/6/2026, results announced same day.