Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›Madras Connector Phase 1 Utility Relocation

Georgia Coweta County Water & Sewerage Authority·Georgia

Madras Connector Phase 1 Utility Relocation

Closes 12/18/2025$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Madras Connector Phase 1 Utility Relocation project involves the relocation of water and sewer utility lines associated with the Madras Connector Phase 1 roadway project in Coweta County, Georgia. The project includes furnishing and installing approximately 1,480 LF of 12” ductile iron water main and appurtenances, 225 LF of 8” ductile iron water main and appurtenances, and 850 LF of 8” PVC sanitary sewer forcemain and appurtenances. The project also involves relocating an existing fire service vault. • The project is being let under one contract. • A cashier’s check or bid bond payable to Coweta County Water & Sewerage Authority is required. • Performance and Payment Bonds and evidence of insurance are required at the signing of the contract. • The bidding documents are available for download through Quest Construction Data Network.

Attached files

Contact

Jarred Jackson(Buyer Contact)

[email protected]

(470) 724-5050

Key dates

Opened
11/18/2025
Closes
12/18/2025

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
PE-33175-NONST-2026-000000007

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves furnishing and installing approximately 1,480 LF of 12” ductile iron water main and appurtenances, 225 LF of 8” ductile iron water main and appurtenances, and 850 LF of 8” PVC sanitary sewer forcemain and appurtenances. The cost of these materials and the labor required to install them will be the primary factors in determining the budget. Based on industry standards, the cost of ductile iron water main can range from $50 to $100 per linear foot, and the cost of PVC sanitary sewer forcemain can range from $20 to $50 per linear foot. The cost of labor can range from $50 to $100 per hour. Taking these costs into account, the total budget for the project could be in the range of $500,000 to $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Watsonville·California

Top match · 64%

River Park Electrical Relocation

Closes 11/5/2026Opened 10/5/2026

City of Springfield·Illinois

64% match

Transmission Line Construction (J1610 Project)

Closes 11/5/2026Opened 10/6/2026

Hastings Utilities·Nebraska

63% match

Water/Sanitary Sewer Relocation HU 2026-69

Rolling / TBD closeOpened 6/30/2026

City of Gallup·New Mexico

63% match

Turnkey-Engineering, Procurement and Construction (EPC) for New Carbon Coal Electrical Substation

Closes 11/6/2026Opened 7/24/2026

City of South San Francisco·California

63% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

Oregon Confederated Tribes of Siletz Indians·Oregon

62% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

City of Charleston, WV·Virginia

62% match

Capital Connector Construction Project

Closes 12/3/2026Opened 10/5/2026

City of Thomas·Oklahoma

62% match

City of Thomas Public Sewer Improvements - Relocation of Public Sewer Line ODOT SH 33

Closes 11/24/2026Opened 10/23/2026

City of Cedar Rapids·Iowa

62% match

2nd Street SE Relocation of Interior Vault Utilities

Closes 11/18/2026Opened 10/21/2026

Oregon Medford Irrigation District·Oregon

62% match

RFP_MID_ODOT_Uility_Relocation

Closes 11/9/2026Opened 10/9/2026

Power Authority of New York·New York

62% match

Office Building Relocation Proj. Mgt. / Movers

Closes 11/2/2026Opened 9/28/2026

Village of Wellington·Florida

62% match

Water Reclamation Facility Solids Control Room Relocation Project.

Closes 11/12/2026Opened 9/29/2026

Virginia Department of Transportation·Virginia

62% match

Coleman Bridge HPU Integration

Closes 11/9/2026Opened 10/30/2026

Mississippi

62% match

BID 27-12 – Mitchell Memorial Electrical Panel Relocation – Plans and Specifications May Be Obtained From Our Website

Closes 11/3/2026Opened 10/30/2026

Power Authority of New York·New York

62% match

LAN CONNECTIVITY EXPANSION

Closes 11/9/2026Opened 10/19/2026

Georgia City of Covington·Georgia

61% match

2026-28 Electric Infrastructure Reconducts

Closes 11/24/2026Opened 10/26/2026

Massachusetts Convention Center Authority·Massachusetts

61% match

V03 - Phase 1 Office Relocation

Closes 11/12/2026Opened 10/14/2026

Iowa State University·Iowa

61% match

CP1269515-Utilities-Pearson Substation-4.16kV Switchgear and Cable Infrastructure Upgrade

Closes 11/3/2026Opened 10/6/2026

Town of Eatonville·Florida

61% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of DeLand·Florida

61% match

Lift Station #10 Relocation

Closes 11/18/2026Opened 10/13/2026

City of Edmond·Oklahoma

61% match

WC24-00005 NE Complex Phase 1 (Danforth Tower Relocation)

Closes 11/18/2026Opened 10/22/2026

City of Manassas·Virginia

61% match

27P001 Jennie Dean Historic Cottage Relocation

Closes 11/17/2026Opened 10/1/2026

City of Orangeburg·South Carolina

61% match

Utility Transmission & Distribution System Construction & Maintenance

Closes 12/2/2026Opened 10/27/2026

Greene County·Virginia

61% match

#SMART18 - Route 670 Connector A Design-Build Project

Closes 2/9/2027Opened 10/30/2026

City of Key West·Florida

61% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026