The project involves the replacement of steam lines at the W.G. Hefner VA Medical Center in Salisbury, NC. The contractor will be responsible for designing and installing temporary piping, anchors, guides, expansion joints, and building connections. The project will be divided into seven mechanical phases, and the contractor must ensure that the work does not disrupt hospital operations. The contractor will also be responsible for submitting coordination drawings and evaluating existing conditions.
• The project requires experience with central utility distribution systems, such as steam, condensate, chilled water, or district energy systems.
• The contractor must ensure that the temporary piping is designed to meet physical-security requirements.
• The contractor must submit a project management plan, including a schedule and a quality control plan.
• The contractor must ensure that all work is done in accordance with OSHA and NCDOT requirements.
• The contractor must provide a final pipe-stress analysis and confirm the stress requirements with the submitted manufacturer and final routing.