Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›PIRATE'S COVE DRAINAGE IMPROVEMENTS

City of Wilmington·North Carolina

PIRATE'S COVE DRAINAGE IMPROVEMENTS

Closes 8/6/2026$5M – $8MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Wilmington is seeking a contractor to replace and upgrade the storm‑drainage system in the Pirate’s Cove neighborhood. The work includes removal of existing pipe and structures, installation of new concrete and high‑performance plastic pipes (15‑ to 48‑inch diameters), construction of catch basins, manholes, and interference structures, extensive earth‑moving and channel widening, utility relocation, erosion‑ and sediment‑control measures, and associated sidewalk, curb, gutter, and asphalt paving. The contract is a lump‑sum with optional unit‑price items, requires a 5 % bid bond, performance and payment bonds, and adherence to a strict schedule (substantial completion within 180 days of NTP and final completion within 240 days). A 14 % MBE/WBE subcontracting goal was removed by Addendum 1. • Replace/upgrade storm‑drain pipes (30‑in. & 48‑in.) and associated structures. • Perform extensive site grading, channel widening, concrete curb/gutter, sidewalk, driveway, and asphalt paving. • Coordinate utility relocations, provide erosion‑control, tree protection/re‑planting, and traffic‑control plans. • Meet a hard deadline of March 13 2027 for jurisdictional stream work and a total construction period of 240 calendar days. • Provide required bonds, insurance, and a detailed good‑faith MBE/WBE effort (now optional).

Attached files

Contact

Zach Roman(Project Manager)

[email protected]

(910) 777-3332

Key dates

Opened
7/23/2026
Questions due
7/30/2026
Pre-bid meeting
7/9/2026Mandatory
Closes
8/6/2026
Projected award
11/1/2026
Duration
240 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237120
Solicitation №
DRA-MG-0826

Budget estimate

$5,000,000 – $8,000,000

Based on typical costs for municipal storm‑drain upgrades (pipe, excavation, utility relocation, paving, and landscaping) in a mid‑size city, a scope of roughly 500 linear feet of large‑diameter pipe plus extensive site work usually falls in the $5 M–$8 M range. The estimate assumes average unit prices for concrete and HDPE pipe, asphalt paving, and the required ancillary work, with a modest contingency for unforeseen utility conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

The Village of Royal Palm Beach·Florida

Top match · 69%

Heron Parkway Drainage Improvements PW1903

Closes 11/10/2026Opened 10/15/2026

City of Charlotte·North Carolina

68% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Charlotte·North Carolina

67% match

Lancer Dr 6818 Storm Drainage Improvement Project

Rolling / TBD closeOpened 10/19/2026

Miami‑Dade County Department of Transportation and Public Works·Florida

67% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 10/23/2026

City of Easley·South Carolina

66% match

North Dale Drive Drainage System Improvements

Closes 1/28/2027Opened 10/16/2026

City of Charlotte·North Carolina

66% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

Town of South Hill·Virginia

66% match

Drainage Improvements: W. Atlantic St. - Mathews St.

Closes 11/4/2026Opened 10/1/2026

City of Charlotte·North Carolina

66% match

Foxwood Road 2727 Storm Drain Improvement Project

Rolling / TBD closeOpened 8/15/2026

City of Charlotte·North Carolina

66% match

Collective AG Storm Water Drainage Improvement Project

Rolling / TBD closeOpened 3/15/2026

City of Panama City·Florida

65% match

SRF Area P-12 Improvements

Closes 11/13/2026Opened 10/7/2026

City of Brandon·Mississippi

65% match

BROOKSTONE PLACE DRAINAGE IMPROVEMENTS

Closes 11/20/2026Opened 10/21/2026

City of Charlotte·North Carolina

65% match

Camp Greene/Freedom Drive Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2028

City of Charlotte·North Carolina

65% match

Log Cabin 937 Storm Drainage Improvement Project

Rolling / TBD closeOpened 12/15/2027

Georgia Henry County Board of Commissioners·Georgia

65% match

BID, 27-22,Drainage Improvements at Grove Pointe Subdivision

Closes 11/25/2026Opened 10/28/2026

City of Virginia Beach·Virginia

65% match

COVB-26-101639-2 - Central Resort District Drainage Improvement Phase 1 Design-Build

Closes 11/5/2026Opened 10/23/2026

Idaho Transportation Department·Idaho

65% match

Key No. 25120 SH-55, HORSESHOE BEND DRAINAGE IMPROVEMENTS

Closes 11/17/2026Opened 10/29/2026

City of Charlotte·North Carolina

65% match

Valleybrook Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/15/2027

Village of North Palm Beach·Florida

65% match

Buoy Road Stormwater

Closes 11/10/2026Opened 10/8/2026

Miami-Dade County·Florida

65% match

Drainage Improvements Multiple Sites

Closes 12/2/2026Opened 11/6/2025

City of Charlotte·North Carolina

65% match

Fawnbrook Ln (514) Storm Drainage Improvement Project

Rolling / TBD closeOpened 5/1/2026

St. Tammany Parish Government·Louisiana

64% match

Wildwood Farms Subdivision Drainage

Closes 11/12/2026Opened 10/22/2026

City of South Miami·Florida

64% match

DRAINAGE IMPROVEMENTS PROJECT AT SW 65 STREET AND SW 65 TERRACE

Closes 12/1/2026Opened 10/27/2026

City of Charlotte·North Carolina

64% match

2500 Briargrove Dr. Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/1/2026

City of Rancho Palos Verdes·California

64% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

Santa Maria-Bonita School District·California

64% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026