Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Flow Monitoring Stations Install

U.S. Department Of Agriculture·Georgia

Flow Monitoring Stations Install

Closes 11/14/2025$50k – $200kSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The USDA FS Southern Research Station – Chipola Experimental Forest intends to award a sole source contract for the installation of flow monitoring stations. The contract will be for a Firm Fixed Purchase Order (PO) for Accutech Instrumentation, Teledyne ISCO Model 6712 Stormwater samplers with Area Velocity Modules and Area Velocity sensors. The proposed contract action is for supplies, and the Government intends to solicit and negotiate with only one source under the authority of FAR 13.106-1(b)(1)(i). • The contract type will be a Firm-Fixed Price one year order. • The NAICS code is 334516 – Analytical Laboratory Instrument Manufacturing. • The anticipated period of performance will be from on or about 01 December 2025 to 31 December 2026. • Interested organizations, businesses, or individuals may identify their interest and capability to respond to the requirement.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Yolanda Padilla

[email protected]

Key dates

Opened
11/6/2025
Questions due
11/14/2025
Closes
11/14/2025
Duration
1 year

Last updated

Details

Type
Sole Source
Industry
Environmental Services
NAICS
334516
Solicitation №
1155253

Budget estimate

$50,000 – $200,000

The budget for this contract can be estimated based on the type of equipment and services required. The Teledyne ISCO Model 6712 Stormwater samplers with Area Velocity Modules and Area Velocity sensors are specialized equipment, and their cost can range from $10,000 to $50,000 or more, depending on the specific configuration and features. Additionally, the installation and maintenance services required for the flow monitoring stations may add to the overall cost. Considering these factors, a rough estimate for the budget could be between $50,000 and $200,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 67%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

NYS Rockland County·New York

64% match

Flow Meter Inspection, Calibration and Testing Services

Closes 11/16/2026Opened 10/23/2026

The Metropolitan District·Connecticut

63% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/5/2026

Arlington County Government·Virginia

62% match

ANNUAL FLOW METER CALIBRATION, INSTALLATION, REPAIR AND REPLACEMENT

Closes 11/9/2026Opened 10/30/2026

Connecticut Metropolitan District Commission·Connecticut

62% match

FLOW METER AND RAIN GAUGE REPLACEMENT

Closes 11/5/2026Opened 10/6/2026

Federal Aviation Administration·Maine

62% match

COMING SOON - Multiple Locations - AWOS System Installation (24038)

Rolling / TBD closeOpened 4/1/2026

City of Denton·Texas

60% match

Non-regulatory Air Quality Sensors

Closes 11/4/2026Opened 10/15/2026

Florida Department of Corrections (FDC)·Florida

59% match

Laboratory Analysis on Water Treatment Plants, Wastewater Treatment Plants, and Groundwater Monitor

Closes 8/30/2027Opened 9/30/2026

Rural Community Water District of Georgetown County·South Carolina

59% match

Water Meter Pit Installation

Closes 11/23/2026Opened 10/27/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

59% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

Michigan

59% match

938-17-16 - Verification, Preventative Maintenance, and Repair Services - Flow Meters

Closes 11/2/2026Opened 10/12/2026

U.S. Department Of Homeland Security·Maryland

59% match

USCG Yard: Sensors and Meters

Closes 11/6/2026Opened 10/30/2026

U.S. Department Of Homeland Security·District of Columbia

59% match

RFI PHARMACY TEMPERATURE MONITORING

Closes 12/4/2026Opened 11/18/2025

State of Wyoming·Wyoming

59% match

Pinedale Gaseous Ambient Air Monitoring Project

Closes 11/9/2026Opened 9/14/2026

City of Phoenix·Arizona

59% match

Flow Meters and Level Meters Supplemental

Closes 11/5/2026Opened 10/15/2026

U.S. Department Of Health And Human Services·South Dakota

59% match

Rosebud Lift Station Construction

Closes 12/1/2026Opened 10/27/2026

U.S. Department Of The Interior·New Mexico

58% match

C--BGNDRF PIPING UPGRADES

Closes 11/13/2026Opened 10/7/2026

City of Punta Gorda·Florida

58% match

SVC-AMI/1626 - Advanced Metering Infrastructure (AMI)

Closes 11/20/2026Opened 9/25/2026

St. John the Baptist Parish Government·Louisiana

58% match

RFQ 2026.30 Engineering Services for Vicknair Canal Pump Station

Closes 11/19/2026Opened 10/28/2026

The Housing Authority of Columbus·Georgia

58% match

Back Flow Testing

Closes 11/6/2026Opened 10/8/2026

U.S. Department Of Commerce·Maryland

58% match

Building 215 Clean Room HEPA Filter Replacement

Closes 11/2/2026Opened 9/29/2026

Massachusetts Town of Kingston·Massachusetts

58% match

Water Meter and Advanced Metering Analytics Maintenance

Closes 11/4/2026Opened 10/15/2026

Johnson County Wastewater·Kansas

58% match

Notice - Progressive Design Build (PDB) Services for the Brush Creek Pump Station Improvements

Rolling / TBD closeOpened 11/4/2026

Atlantic County Utilities Authority, NJ·New Jersey

58% match

Atlantic City Flow Meter Replacement Project

Closes 11/4/2026Opened 10/6/2026

City of Salisbury·Maryland

58% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026