Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›North Cedar Improvements

City of Chico·California

North Cedar Improvements

Closes 3/11/2026$2M – $2.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Chico is soliciting bids for the North Cedar Street Improvements project, which involves full depth reclamation of the roadway, new sidewalks, driveways, curb ramps, storm drain inlets and manholes, curb and gutter, relocating and rebuilding fences, installing HDPE conduit, landscaping and irrigation, hot mix asphalt paving, and thermoplastic striping. The project is funded with a combination of Local and State funding, and the Engineer's Estimate for this Contract is $2,150,000. The project has a contract time of 65 working days. Some key features of the project include: • Full depth reclamation of the roadway • New sidewalks, driveways, curb ramps, storm drain inlets and manholes • Curb and gutter installation • Fence relocation and rebuilding • HDPE conduit installation • Landscaping and irrigation • Hot mix asphalt paving • Thermoplastic striping The project requires the payment of prevailing wage rates to be paid to members of each craft or classification performing work on this project. The City of Chico will post the bid totals and subcontractor list of the apparent low bidder on Public Purchase after the bid reading.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ryan Morris(Public Works Contact)

[email protected]

(530) 879-6963

Key dates

Opened
2/11/2026
Questions due
3/11/2026
Closes
3/11/2026
Duration
65 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
50614

Budget estimate

$2,000,000 – $2,500,000

Based on the Engineer's Estimate for this Contract, which is $2,150,000, we can estimate that the budget for this project will be around $2,000,000 to $2,500,000. This estimate takes into account the scope of work, which includes full depth reclamation of the roadway, new sidewalks, driveways, curb ramps, storm drain inlets and manholes, curb and gutter, relocating and rebuilding fences, installing HDPE conduit, landscaping and irrigation, hot mix asphalt paving, and thermoplastic striping. The factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the prevailing wage rates for the area.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Iowa State University·Iowa

Top match · 62%

CP1275129-Linden Residence Hall-North Retaining Wall-Repairs

Closes 11/12/2026Opened 10/15/2026

City of Cedar Rapids·Iowa

62% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

61% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of North Charleston·South Carolina

60% match

Northwoods Estates Pond Improvements (REVISION)

Closes 11/17/2026Opened 10/16/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

60% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Cedar Rapids·Iowa

60% match

34th Street SE from North of Terry Drive to Cottage Grove Avenue

Closes 11/18/2026Opened 10/21/2026

City of Salina·Kansas

60% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

New York City Department of Environmental Protection·New York

60% match

82627B0022-BEDC-NR-107 Structural improvements to the North River WRRF

Closes 12/9/2026Opened 10/22/2026

City of North Charleston·South Carolina

60% match

Northwoods Estates Pond Improvements

Closes 11/3/2026Opened 10/5/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Cleveland·Ohio

59% match

North Coast Connector

Closes 12/30/2026Opened 10/1/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Cedar Rapids·Iowa

59% match

Cedar Lake Amenities Bid Package 3B: Recreational Amenities

Closes 11/18/2026Opened 10/22/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%2010-12-26

Rolling / TBD closeOpened 10/12/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of North Kingstown·Rhode Island

59% match

NK Library Bathroom Renovation

Closes 2/27/2027Opened 1/22/2026

Delta Airport Consultants·Virginia

59% match

COMING SOON - Winchester, VA - Winchester Regional Airport - Northside Site Preparation (25023)

Rolling / TBD closeOpened 6/1/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026

City of Salina·Kansas

59% match

North%20Ohio%20Overpass%20Q%26A%20UPDATED%209-8-26

Rolling / TBD closeOpened 9/8/2026