The purpose of this project is to replace the existing tunnel ventilation system with steam heating coils with two natural gas indirect fired make-up air units (MAUs). The construction effort will procure and deliver a complete, operational tunnel ventilation system, including removal of existing equipment, installation of MAUs, and all associated systems required for safe, reliable, and continuous ventilation system. The work will be planned and phased to be performed between May 1 and October 31, mitigating the chances for pipes to freeze.
Key aspects of the project include:
• Replacement of the existing tunnel ventilation system
• Installation of two natural gas indirect fired make-up air units (MAUs)
• Removal of existing equipment
• Installation of associated systems for safe and reliable ventilation
• Phased work to mitigate pipe freezing risks
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.