The Recreation and Park Commission of East Baton Rouge Parish is seeking competitive sealed bids to design‑build and construct a new playground, pavilion, and an accessible 80‑foot connection at Anna T. Jordan Community Park. The work includes demolition of existing structures, site grading, concrete paving, erosion‑control measures, new tree planting, installation of playground equipment, bonded‑rubber surfacing, shade structures, irrigation, lighting, and site furnishings. The contract requires a Louisiana “Building Construction” license, a 5 % bid bond, and a 100 % performance bond. Bids are due June 30, 2026, with a pre‑bid conference on June 17, 2026 (non‑mandatory). The project schedule calls for a 330‑day contract period after the notice to proceed.
• New playground equipment, primary structure, sculpted berm, and supporting elements
• Construction of a pavilion and an 80‑ft accessible pathway linking the playground to ball fields and parking
• Site improvements: grading, concrete sidewalks, erosion control, irrigation, tree planting, and bonded‑rubber surfacing
• Required licenses, bonds, insurance, and compliance with Louisiana state contracting statutes