The Bureau of Land Management (BLM) is seeking a design-build contractor to furnish all labor, materials, equipment, and supervision necessary to deliver fully integrated design and construction services for the GAOA Centennial Trail Bridge project near Sturgis, South Dakota. The project includes designing and constructing abutments, riprap abutment protection, and installing a steel or timber bridge. The bridge construction shall follow the FHWA “Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP‐24).”
• The project is located near Sturgis, South Dakota, in the BLM Fort Meade Recreation Area.
• The project requires a design-build contractor with experience in bridge construction.
• The project has a magnitude of construction between $250,000 - $500,000.
• The project has an estimated period of performance of 290 calendar days after issuance of the notice to proceed.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.