The County of Stanislaus seeks an experienced engineering firm to design, engineer, and provide permitting assistance for the rehabilitation of the water‑supply system at Turlock Lake State Recreation Area. Work is divided into Phase 1 (Areas A & B) to deliver a functional water system by Memorial Day 2027, and Phase 2 (Areas C & D) for later upgrades. The scope includes utility exploration, civil, structural, environmental, electrical, and waterfront engineering, as well as detailed design documents, specifications, and construction‑ready plans.
• Design and replace aging well‑pump, chlorine feed, hydropneumatic tank, pressure controls, and above‑ground piping for Phase 1.
• Provide demolition, site grading, fencing, ADA‑compliant parking, and boat‑dock replacement as required.
• Conduct utility investigations, permitting support, and full engineering deliverables for Phase 2 improvements (secondary pump house, booster systems, pipelines).
• Submit a qualified Statement of Qualifications with firm experience, personnel resumes, project approach, and schedule; rates are confidential and evaluated after technical qualification.