Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Market Survey: The FAA is seeking interested Contractors…

U.S. Department Of Transportation·Texas

Market Survey: The FAA is seeking interested Contractors that have the capability to design and construct two new Airport Traffic Control Towers (ATCTs).

Closes 4/21/2026$80M – $140MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Federal Aviation Administration (FAA) is conducting a market survey to identify interested contractors who can design and construct two new Airport Traffic Control Towers (ATCTs) in Prescott, AZ, and Mesa, AZ. The towers will be designed and built using the Design-Build project delivery method, and the FAA estimates the cost to be between $40 million and $70 million per site. The scope of work includes all design services, construction, commissioning coordination, and support. The FAA is seeking information from vendors on their experience, capabilities, and interest in submitting a proposal for one or both project locations. • The project involves designing and constructing two ATCTs with adjacent administrative buildings. • The towers will be built using the Design-Build project delivery method. • The FAA estimates the cost to be between $40 million and $70 million per site. • Vendors are asked to provide information on their experience, capabilities, and interest in submitting a proposal. • The scope of work includes all design services, construction, commissioning coordination, and support.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sue Newcomb(Contracting Officer)

[email protected]

(781) 238-7659

Key dates

Opened
4/2/2026
Questions due
4/21/2026
Closes
4/21/2026

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236220
Solicitation №
697DCK-26-R-00207

Budget estimate

$80,000,000 – $140,000,000

Based on the estimated cost of $40-70 million per site, the total budget for the project could be between $80-140 million. This estimate is influenced by the complexity of the project, the location, and the materials required. The actual budget may vary depending on the vendor's proposal, the FAA's requirements, and other factors.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Florida

Top match · 88%

MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·Mississippi

81% match

P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR FACILITY AT KEESLER AIR FORCE BASE, BILOXI, MS

Closes 11/4/2026Opened 10/27/2026

U.S. Department Of Defense·Idaho

81% match

Design and construct an Air Traffic Control Tower at Mountain Home Air Force Base ID

Closes 11/12/2026Opened 10/28/2026

San Joaquin County·California

78% match

Stockton Metropolitan Airport (SCK) Access Control System Assessment, Upgrade, Consulting, and Maintenance

Closes 12/18/2026Opened 10/30/2026

Georgia Bulloch County Board of Commissioners·Georgia

77% match

Airport Consulting Services - Engineering

Closes 12/3/2026Opened 10/29/2026

City of Charlotte·North Carolina

76% match

Airport Surveillance Radar Relocation Construction

Rolling / TBD closeOpened 5/3/2027

State Technical College of Missouri·Missouri

76% match

1H3 Airport Notice-to-Airport-Consultants

Closes 11/13/2026Opened 10/28/2026

Town of Leesburg·Virginia

76% match

RFQ No 320830-FY27-15 Pre-Qualification for Construction - Leesburg Executive Airport Air Traffic Control Tower

Closes 11/23/2026Opened 10/26/2026

Texas Department of Transportation·Texas

76% match

TxDOT Aviation Division- Notice to Consultants

Closes 11/10/2026Opened 10/14/2026

U.S. Department Of Transportation·Alaska

76% match

Market Survey for Janitorial Services at FAA Facilities in King Salmon, Alaska

Closes 11/30/2026Opened 10/28/2026

U.S. Department Of Defense·Washington

76% match

Fort Bliss Air Traffic Control Services

Closes 10/31/2026Opened 9/30/2026

Bill and Hillary Clinton National Airport·Arkansas

75% match

Airport Service Development Consultant

Closes 12/2/2026Opened 10/31/2026

City of Prescott·Arizona

75% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

City of Albany·Georgia

75% match

Airport Marketing Plan

Closes 11/10/2026Opened 10/7/2026

City of Lawrence·Kansas

75% match

On-Call Engineering, Architecture and Construction Services for Airport Development

Closes 11/10/2026Opened 10/19/2026

U.S. Department Of Defense·Kentucky

75% match

WPAFB 3rd Air Stream/ B18

Closes 10/31/2026Opened 10/17/2025

Louisiana Tech University Office of Purchasing·Louisiana

75% match

Purchase of an FAA Approved Aviation Training Device

Closes 11/2/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

75% match

FY26 PROJECT WWXT240800 MULTI-PURPOSE APRON AND TAXIWAY, ROYAL AUSTRALIAN AIR FORCE (RAAF) BASE TINDAL, AUSTRALIA

Closes 12/17/2026Opened 9/28/2026

Texas Department of Transportation·Texas

75% match

TxDOT Aviation Division- Notice to Consultants

Closes 11/12/2026Opened 10/15/2026

City of Santa Fe, NM·New Mexico

75% match

Airport Security Coordinator (ASC) On-Call Services - Santa Fe Regional Airport

Closes 11/16/2026Opened 11/3/2026

NYS Niagara Frontier Transportation Authority·New York

75% match

NFIA – Runway 10-28 Rehabilitation (Designs)

Closes 11/3/2026Opened 10/2/2026

U.S. Department Of Defense·Texas

74% match

Fort Bliss Air Traffic Control Services

Closes 11/11/2026Opened 9/30/2026

U.S. Department Of Transportation·Alaska

74% match

Market Survey for Helicopter Services for the FAA between Juneau and other Sites in Alaska

Closes 11/30/2026Opened 10/28/2026