The Gwinnett Drive Widening Project involves various construction services, including erosion control, traffic control, demolition, site work, earthwork, concrete paving, storm drain structures, and paving. The project requires compliance with federal, state, and local requirements and specifications. The work must be completed during nighttime hours, from 9 PM to 5 AM, on business days. The project includes:
• Erosion control measures such as mulch, tree save fence, temporary grassing, inlet sediment trap, silt fence, and sodding
• Traffic control during all stages of the project
• Demolition, including tree removal, clearing, and grubbing
• Site work and earthwork, including grading and excavation
• Concrete paving, including remove and replace concrete curb and gutter, sidewalks, and driveways
• Storm drain structures and storm drain pipe
• Paving, pavement striping, signage, and traffic loops
• Pedestrian light poles, handrails, and fire hydrant installation