Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Engineering Services
  5. ›Professional Engineering Services for the Advanced…

City of Reno·Nevada

Professional Engineering Services for the Advanced Purified Water Facility (APWF)

Closes 6/22/2026$1.5M – $4MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Reno is seeking a qualified professional‑engineering consulting firm to serve as the owner’s representative for the design‑build construction of the Advanced Purified Water Facility (APWF) and associated upgrades at the Reno‑Stead Water Reclamation Facility. The consultant will be on‑site full‑time, overseeing construction, reviewing submittals, managing change orders, coordinating with the CMAR contractor and Truckee Meadows Water Authority, and providing commissioning support. This role spans the 30‑month construction period plus an additional six‑month commissioning phase. • Provide daily on‑site representation, progress reporting, and schedule coordination for a $224 M water‑infrastructure project. • Review RFIs, submittals, change orders, and ensure the City’s interests are reflected in construction decisions, especially for RSWRF unit processes, transfer pump station, and transmission mains. • Support startup and commissioning activities, documenting set‑points and assisting City operations staff. • Must be a Nevada‑licensed professional engineering firm with required insurance and bonding; must submit a complete electronic RFQ package by the deadline.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Marcie Wood(Management Analyst – Procurement)

[email protected]

(775) 326-6658

Key dates

Opened
5/21/2026
Questions due
6/5/2026
Closes
6/22/2026
Duration
36 months

Last updated

Details

Type
Request for Quotation
Industry
Engineering Services
NAICS
541330
Solicitation №
USD RFQ 2026-10

Budget estimate

$1,500,000 – $4,000,000

The solicitation does not disclose a fee schedule. For a large‑scale owner’s‑representation role on a $224 M water‑infrastructure project lasting roughly three years, consulting firms typically charge 1–2 % of the construction budget or a fixed fee based on effort. Assuming a midpoint of 1.5 % yields about $3.4 M over the contract term; lower‑end firms may accept around $1.5 M, while higher‑end firms could negotiate up to $4 M, especially if they include extensive commissioning support. Factors influencing the final fee include the firm’s staffing level, hourly rates, risk assumptions, and any performance‑based incentives.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Temple Terrace, FL·Florida

Top match · 74%

Professional Engineering Services for PFAS Compliance Nanofiltration Treatment, and Concentrate Management

Closes 11/16/2026Opened 10/6/2026

Eastern Municipal Water District·California

74% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Ontario·California

73% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

Washington Suburban Sanitary Commission, MD·Maryland

73% match

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

Fort Pierce Utilities Authority·Florida

73% match

Water & Wastewater Systems Continuing Professional Engineering and/or Design Services

Closes 11/2/2026Opened 10/6/2026

Village of Cary·Illinois

72% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

Washington Suburban Sanitary Commission·Maryland

72% match

Potomac WFP Water Quality/PFAS Pilot Project REBID

Closes 12/1/2026Opened 10/14/2026

Immokalee Water & Sewer District·Florida

72% match

REQUEST FOR QUALIFICATIONS for PROFESSIONAL ENGINEERING DESIGN AND CONSTRUCTION PHASE SERVICES FOR WASTEWATER RECLAMATION FACILITY HARDENING PROJECT

Closes 11/25/2026Opened 10/29/2026

Western Municipal Water District·California

72% match

PFAS Treatment at Arlington Desalter Plant

Closes 11/5/2026Opened 10/1/2026

Fort Pierce Utilities Authority·Florida

72% match

Water & Wastewater Systems Continuing Design-Build Services

Closes 11/2/2026Opened 10/6/2026

Fort Pierce Utilities Authority·Florida

72% match

Gas Operations Professional Engineering and/or Design Services

Closes 11/5/2026Opened 10/9/2026

Dept of Natural Resources·Wisconsin

72% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026

Fort Pierce Utilities Authority·Florida

72% match

Architectural Professional Engineering and/or Design Services

Closes 11/9/2026Opened 10/9/2026

Maryland Mayor and Town Council of Oakland·Maryland

71% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

El Paso Water·Texas

71% match

On-Call Professional Engineering Services for Mechanical, Electrical, and Plumbing Engineering Services for Water, Wastewater, Reclaimed Water, Stormwater, and Administrative Facilities

Closes 12/2/2026Opened 10/25/2026

City of Riverside·California

71% match

SITE MODIFICATIONS AT THE PALMYRITA WATER TREATMENT PLANT FOR PFAS REMOVAL

Closes 11/24/2026Opened 10/15/2026

City of Salisbury·Maryland

71% match

Park Water Treatment Plant PFAS Study 1

Closes 11/27/2026Opened 10/29/2026

City of Hollywood·Florida

71% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER DISTRIBUTION, TRANSMISSION & WASTEWATER COLLECTION PROGRAM MANAGEMENT (PROJECT NO. 26-1352)

Closes 11/17/2026Opened 10/13/2026

Maryland Washington Suburban Sanitary Commission·Maryland

70% match

Water Engineering Services

Closes 11/18/2026Opened 10/17/2026

City of Charlotte·North Carolina

70% match

Professional Engineering Services for Emergency and Routine Repair

Rolling / TBD closeOpened 12/11/2026

Town of Lexington·South Carolina

70% match

Services for Potable Water System Hydraulic Modeling and Program Management

Closes 11/5/2026Opened 9/16/2026

City of Ann Arbor·Michigan

70% match

Professional Engineering Services for Dam Support

Closes 11/10/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

70% match

Waste Water Treatment Plant Services

Closes 11/23/2026Opened 10/12/2026

City of Hollywood·Florida

70% match

PROFESSIONAL SERVICES RELATED TO WATER AND WASTEWATER TREATMENT PLANT PROGRAM MANAGEMENT (PROJECT NO. 26-1351)

Closes 11/10/2026Opened 10/6/2026

Village of Lake in the Hills·Illinois

70% match

PFAS & Iron Filtration System Design, Equipment, and Delivery

Closes 11/3/2026Opened 10/9/2026