The Washtenaw County Parks and Recreation Commission is seeking a Construction Manager at Risk (CMAR) for the Eastern Washtenaw Community Recreation Center (EWCRC) project. The selected CMAR will perform pre-construction, construction management, and post-construction services for the new 61,500 sq. ft. facility. The project includes indoor aquatic facilities, a gymnasium, a wellness and fitness center, on-site childcare, a teen drop-in space, and over 4,000 square feet of flexible meeting space. The total project budget is $32 million, which includes architecture and engineering fees, permitting, site work, utilities, construction, construction management fees, furniture, fixtures, and equipment (FF&E), and other related costs.
• The CMAR will advise the County and Architect/Engineer (A/E) on proposed site use and improvements.
• The CMAR will prepare an initial Estimated Project Schedule and update it monthly as the project proceeds.
• The CMAR will provide preliminary cost estimates for the Cost of the Work based on the A/E’s refined Schematic Design and Design Development Drawings and available Specifications.
• The CMAR will participate in pre-construction activities, including project approach determination, definition, constructability reviews, input on optional systems/materials availability and alternative construction methodologies.
• The CMAR will hold and manage all trade contracts, direct day-to-day construction operations, means and methods, sequencing, site safety, quality control, cost control, and schedule performance under the Guaranteed Maximum Price (GMP).