Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wisconsin
  4. ›Engineering Services
  5. ›2026 Badger Mill Creek Watershed Study

City of Madison·Wisconsin

2026 Badger Mill Creek Watershed Study

Closes 6/18/2026$200k – $250kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Madison Engineering Division is seeking proposals from qualified vendors for the 2026 Badger Mill Creek Watershed Study. The study aims to update existing watershed models to reflect current conditions, identify areas of the stormwater management system that do not meet current performance targets, and understand how the current stormwater management system functions within the Lower Badger Mill Creek Watershed relative to pre-developed conditions. The scope of work includes reviewing existing watershed models, updating existing conditions models, executing updated existing conditions models, and evaluating flood mitigation alternatives. • The consultant will review existing PC-SWMM models and supporting GIS data provided by the City. • The consultant will update the modeled 2D surface in areas where the topography has changed since the initial modeling effort. • The consultant will incorporate pipes larger than 12” in diameter and storm structures that are not reflected in the existing models. • The consultant will update model hydrology in areas where land use or land cover has changed since the original modeling effort. • The consultant will evaluate flood mitigation alternatives, including peak flow control and pre-developed conditions modeling.

Attached files

Contact

Brittany Garcia(Purchasing Services)

[email protected]

(608) 243-0529

Key dates

Opened
5/20/2026
Questions due
6/1/2026
Closes
6/18/2026
Projected award
7/15/2026
Duration
24 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
15034-0-2026-BG

Budget estimate

$200,000 – $250,000

The City of Madison has budgeted an estimated $200,000-$250,000 to complete the scope of work described in the RFP. This estimate is based on the complexity of the project, the scope of work, and the level of expertise required. Factors that may influence the likely payment range include the consultant's experience, the level of detail required for the modeling and analysis, and the number of iterations required to complete the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Ontario County·New York

Top match · 69%

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/16/2026

Santa Clara Valley Water District·California

68% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

County of Ontario·New York

67% match

Geneva Drinking Water Plant Floodplain Restoration Project Feasibility Study

Closes 12/15/2026Opened 10/15/2026

Illinois Natural Resources·Illinois

67% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

Illinois Natural Resources·Illinois

65% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

U.S. Geological Survey·United States of America

65% match

Cooperative Agreement for Affiliated Partner with the Pacific Northwest Cooperative Ecosystem Studies Unit (CESU)

Closes 11/14/2026Opened 10/14/2026

U.S. DOT Federal Highway Administration·United States of America

65% match

Fiscal Year 2026 Wildlife Crossings Pilot Program

Closes 11/16/2026Opened 9/30/2026

City of Madison·Wisconsin

65% match

Castle Creek Channel Improvements at Warner Park

Closes 11/5/2026Opened 10/23/2026

California Grants·California

65% match

Proposition 68 Rivers and Streams Grant Program – Klamath-Trinity Watershed

Rolling / TBD closeOpened 6/17/2025

Oregon Department of Forestry·Oregon

65% match

The Dalles Watershed Project GNA 2026

Closes 11/2/2026Opened 10/2/2026

City of Seattle·Washington

65% match

Outreach Event: Cascades Dam Tour

Closes 2/26/2027Opened 9/30/2026

Washakie County Conservation District·Wyoming

64% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

City of Madison - Purchasing Services·Wisconsin

64% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/3/2026Opened 10/6/2026

Delaware Valley Regional Planning Commission·Pennsylvania

64% match

Schuylkill River Pedestrian and Cyclist Bridge Feasibility Study (TCDI Project Category 5 – Transportation and Infrastructure Planning)

Closes 12/4/2026Opened 10/30/2026

Laramie Rivers Conservation District·Wyoming

64% match

Laramie River - Hart Ranch Restoration

Closes 11/8/2026Opened 8/27/2026

U.S. Department Of Defense·Illinois

64% match

DUTCH GAP AQUATIC ECOSYSTEM RESTORATION, ANTIOCH, LAKE COUNTY, ILLINOIS

Closes 8/8/2028Opened 8/12/2025

Michigan Department of Technology, Management & Budget (DTMB)·Michigan

64% match

472/26613.TAP; Boston Pond - Dam Study

Closes 11/19/2026Opened 10/29/2026

East Bay Municipal Utility District·California

64% match

Local Watershed Tree Planting Maintenance and Monitoring

Closes 11/17/2026Opened 10/14/2026

Colorado Department of Natural Resources (DNR)·Colorado

64% match

Evaluation of Hydrology & Water Availability 15MR CO River

Closes 11/18/2026Opened 10/30/2026

City of Casper·Wyoming

64% match

Glendale Detention Pond Improvements, project 25-044

Closes 11/6/2026Opened 10/16/2026

City of Madison·Wisconsin

64% match

2027-2028 Ecological Restoration and Maintenance

Closes 11/3/2026Opened 10/6/2026

U.S. Fish and Wildlife Service·United States of America

64% match

F26AS00062: Great Lakes Fish and Wildlife Restoration Act FY 2026

Rolling / TBD closeOpened 6/1/2026