Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Ohio guideOhio Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Ohio
  4. ›Construction
  5. ›Raw Water Main Improvements - Contractor Pre-qualification

City of Toledo·Ohio

Raw Water Main Improvements - Contractor Pre-qualification

Closes 5/12/2026$10M – $20MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Toledo’s Department of Public Utilities – Water Treatment Division is seeking qualified contractors, joint‑ventures, or teaming arrangements to design‑build a new 72‑inch raw water transmission main to replace an aging 78‑inch steel line. The work includes installing over 52,000 ft of spiral‑welded steel pipe, multiple tunnel sections, valve‑vaults, yard piping, and ancillary structures while maintaining uninterrupted service on the existing 60‑inch main. The project is funded by the Ohio EPA Water Supply Revolving Loan Account and is divided into three separate contract segments that will be competitively bid after pre‑qualification. • New 72‑inch steel water main (≈ 52,223 LF) from Low Service Pump Station to Collins Park Water‑Treatment Plant. • Six tunnel installations (≈ 815 LF) plus a dual‑pipe tunnel (≈ 762 LF) and ten open‑cut road/utility crossings. • Required experience includes large‑diameter water pipelines, tunneling, railroad coordination, and contaminated‑soil work; up to seven prior projects must be documented on Schedule C. • Six hard‑copy + one electronic copy of the Qualifications Statement due May 12 2026; no pricing may be included. • Pre‑qualification will determine which firms may bid on Segments 1‑3; construction is scheduled to start March 2027 with final project completion by March 2030.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
3/27/2026
Questions due
5/4/2026
Closes
5/12/2026
Duration
3 years

Last updated

Details

Type
Request for Qualification
Industry
Construction
NAICS
237110
Solicitation №
10008594

Budget estimate

$10,000,000 – $20,000,000

The solicitation cites an estimated construction cost of roughly $199 million. Assuming a typical contractor profit margin of 5‑10 % for large‑scale water‑infrastructure projects, the expected net earnings for the prime contractor(s) would fall in the $10‑20 million range. This estimate accounts for the division of the work into three segments, the need for specialized tunneling and environmental mitigation, and the extensive labor and material requirements.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Arkansas

Top match · 78%

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

New York City Department of Design and Construction·New York

77% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

New York City Department of Design and Construction·New York

77% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

Cobb County, GA·Georgia

76% match

Request for Qualifications for Prequalification of New Contractors for Cobb County Water System for 2026-2028 Period

Closes 5/31/2028Opened 8/29/2025

New York City Department of Design and Construction·New York

75% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

City of Dunedin·Florida

75% match

Water Production Well Facilities Project

Closes 11/18/2026Opened 10/12/2026

Massachusetts Town of Hull·Massachusetts

75% match

Secondary Clarifiers, Grit & Building Upgrades

Closes 5/6/2027Opened 4/8/2026

The Metropolitan Water District of Southern California·California

74% match

Construction Manager/General Contractor Services for Direct Potable Reuse Demonstration Facility

Closes 11/12/2026Opened 9/4/2026

City of Ontario·California

74% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

Snowline Joint Unified School District·California

74% match

Notice to Pre-Qualify for 2026 Public Works

Rolling / TBD closeOpened 12/8/2025

Carroll County·Maryland

74% match

Prequalification of Contractors for Utility System Repair and Replacement Services

Closes 11/4/2026Opened 10/1/2026

Maryland Carroll County Government - Procurement·Maryland

74% match

Prequalification of Contractors for Utility System Repair and Replacement Services

Closes 11/4/2026Opened 10/3/2026

Massachusetts Auburn Water District Inactive·Massachusetts

74% match

Qualifications for Water Treatment Plant Construction

Closes 1/4/2027Opened 10/28/2026

City of Philadelphia·Pennsylvania

74% match

PW Prequal Bid 2785-RELAY of WATER MAINS and Construction of GSI in S 61ST

Closes 12/31/2026Opened 9/22/2026

City of Bellevue·Washington

74% match

2027 Phase 1 Water Main Replacement

Closes 11/12/2026Opened 10/22/2026

City of DeLand·Florida

73% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

City of Riverside·California

73% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

City of Cortez·Colorado

73% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

City of Salina·Kansas

73% match

ADDENDUM%20NO%201%2026017%202026%20Water%20Mains%20Replacement

Rolling / TBD closeOpened 8/7/2026

City of Stillwater·Oklahoma

73% match

Lake McMurtry Pump Station

Closes 11/11/2026Opened 8/31/2026

Little Rock Water Reclamation Authority·Arkansas

73% match

SIDESTREAM TREATMENT IMPROVEMENTS – Little Rock Water Reclamation Authority RFQ

Closes 11/10/2026Opened 10/11/2026

Municipality of Anchorage·Alaska

73% match

Provide Water Distribution System Condition Assessment – RFP 2026P051

Closes 11/13/2026Opened 10/2/2026

U.S. Department Of Defense·Pennsylvania

73% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Town of Cutler Bay·Florida

73% match

Old Cutler Commons UN1 & UN2 Sub-Basins Water Quality Improvement Project

Closes 1/13/2027Opened 10/23/2026

Board of County Commissioners, Palm Beach County·Florida

73% match

Prequalification Annual Contract Plumbing Services

Closes 7/6/2030Opened 6/5/2025