The WRRC Boiler Upgrades project involves the replacement of existing boilers with new steam generators, as well as upgrades to the electrical power distribution system. The project requires the completion of design, including electrical power studies, and coordination with PG&E to ensure that all requirements are met. The contractor will be responsible for providing the necessary equipment, including switchgear, transformers, and panelboards. The project also involves the installation of new electrical equipment, including a hydraulic separator, and the termination of steam vents.
• The project requires the completion of design, including electrical power studies, and coordination with PG&E.
• The contractor will be responsible for providing the necessary equipment, including switchgear, transformers, and panelboards.
• The project involves the installation of new electrical equipment, including a hydraulic separator, and the termination of steam vents.
• The contractor must test and treat water per Specification 23 52 46.00 20.
• The contractor must provide batteries required by PG&E.