Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›South Carolina
  4. ›Construction
  5. ›Pedestrian Walkway and Bridge Project at Hilton Head…

Beaufort County, SC·South Carolina

Pedestrian Walkway and Bridge Project at Hilton Head Island Airport

Closes 8/25/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Beaufort County is seeking a qualified design-build firm to provide turnkey design-build services for the construction of a pedestrian walkway and bridge at Hilton Head Island Airport. The project includes engineering and design, permitting, site preparation, construction of approximately 120 linear feet of ADA-compliant pedestrian walkway, an approximately 40-foot pedestrian bridge, lighting, safety features, and all associated work necessary to provide a safe, direct, and accessible pedestrian connection between the new employee parking area located at 32 Hunter Road and the Airport's existing employee parking area. The selected firm shall be responsible for obtaining all required permits and coordinating with the Town of Hilton Head Island for work associated with the existing stormwater runoff channel. Key considerations include: • Providing a safe, durable, and attractive pedestrian connection • Meeting all applicable ADA accessibility requirements • Utilizing corrosion-resistant, low-maintenance materials suitable for a coastal environment • Minimizing long-term maintenance and life-cycle costs • Providing a visually appealing structure that enhances the airport environment The Airport encourages innovative design solutions that enhance the visual appearance of the airport while providing a durable, low-maintenance, and cost-effective pedestrian bridge and walkway.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Marlene Myers(Procurement Services Director)

[email protected]

(843) 929-7967

Key dates

Opened
7/22/2026
Questions due
8/13/2026
Pre-bid meeting
8/5/2026
Closes
8/25/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237310
Solicitation №
082526

Budget estimate

$500,000 – $2,000,000

Based on the scope of work, which includes the construction of a pedestrian walkway and bridge, the estimated budget could range from $500,000 to $2,000,000. This estimate considers the costs of materials, labor, and equipment required for the project. However, the actual budget may vary depending on factors such as the complexity of the design, the location, and the contractor's expertise.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Town of Hilton Head Island·South Carolina

Top match · 70%

Crossings Park Improvements Phase 2-Skate Park and Pump Track

Closes 12/10/2026Opened 10/26/2026

Raleigh Durham Airport Authority·North Carolina

68% match

Taxiway J Rehabilitation

Closes 11/30/2026Opened 10/26/2026

Port of Portland·Oregon

68% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

County of Okaloosa·Florida

67% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Port of Portland·Oregon

67% match

Portland International Airport North Runway Rehabilitation

Closes 11/12/2026Opened 10/15/2026

U.S. Department Of Transportation·Hawaii

67% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Delta Airport Consultants·Pennsylvania

66% match

COMING SOON - Clearfield-Lawrence Airport - Install Runway 12-30 Visual NAVAIDs-PAPI (24074)

Rolling / TBD closeOpened 10/22/2026

State of Hawaii Department of Transportation, Airports·Hawaii

66% match

CO1549-33 LOBBIES 4 AND 5 IMPROVEMENTS

Closes 11/19/2026Opened 9/24/2026

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

66% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

Town of Hilton Head Island·South Carolina

66% match

Crossings Park Improvements Phase 1-Pickle Ball Courts & Arrow Road

Closes 11/18/2026Opened 10/6/2026

Delaware Coastal Airport·Delaware

66% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026

Recreation and Park Commission for the Parish of East Baton Rouge (BREC)·Louisiana

66% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 10/1/2026

State of Hawaii Department of Transportation – Airports·Hawaii

66% match

CM1530-33 Apron Reconstruction, Phase 1, Kahului airport

Closes 11/16/2026Opened 10/2/2026

Sanford Airport Authority·Florida

65% match

Airport Digital Twin Platform Implementation and Support Services

Closes 11/23/2026Opened 10/22/2026

City of Mankato·Kansas

65% match

Mankato Airport (TKO) | 24434

Closes 11/19/2026Opened 10/31/2026

Virgin Islands Port Authority·U.S. Virgin Islands

65% match

STTJ)-2027-03 (Roof Repairs at Ashley Restaurant, St Thomas USVI

Closes 11/20/2026Opened 10/20/2026

Virgin Islands Port Authority·U.S. Virgin Islands

65% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

City of Prescott·Arizona

65% match

PRC Airport Hangar Development Phase 1

Closes 12/10/2026Opened 10/30/2026

Port of Portland·Oregon

65% match

Portland International Airport Taxiway K West Gates E3 to E6 and Vehicle Service Road Rehabilitation

Closes 11/4/2026Opened 10/8/2026

Municipality of Anchorage·Alaska

65% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026

City of Alexandria·Louisiana

65% match

Masonic Drive Sidewalk - Hynson Bayou Pedestrian Bridge Replacement

Closes 12/1/2026Opened 10/23/2026

Massachusetts Port Authority (Massport)·Massachusetts

65% match

Terminal C Redevelopment Logan International Airport

Closes 11/6/2026Opened 10/21/2026

Port of Portland·Oregon

65% match

Portland International Airport Terminal Upper Roadway Joint Replacement

Closes 11/10/2026Opened 10/7/2026

City of Boise·Idaho

65% match

2027 Airport Way & Elevated Roadway Construction

Closes 11/12/2026Opened 9/30/2026

BREC·Louisiana

65% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026