Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›VOFE Water System Improvements

NYS Fort Edward, Village of·New York

VOFE Water System Improvements

Closes 12/4/2025$700k – $2.5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work). Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system. Business enterprises awarded an identical or substantially similar procurement contract within the past five years: none Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 20.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Janelle Rose(Clerk-Treasurer)

[email protected]

(518) 747-4023

Key dates

Opened
10/29/2025
Pre-bid meeting
11/10/2025
Closes
12/4/2025
Duration
630 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
18458

Budget estimate

$700,000 – $2,500,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a new 200,000-gallon pedesphere water storage tank, site preparation, and associated site improvements. The cost of such a project can range from $500,000 to $2,000,000, depending on the location, materials, and labor costs. The electrical work for the new tank and modifications to the existing booster pump station may add an additional $200,000 to $500,000 to the total cost. Therefore, the estimated budget for this project can be between $700,000 and $2,500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Charlotte·North Carolina

Top match · 71%

Service Water Improvements and Flow Meter Modifications

Rolling / TBD closeOpened 1/31/2026

St. Helena Parish Police Jury·Louisiana

70% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Veterans Affairs·Washington

66% match

Water system Maintenance

Closes 11/6/2026Opened 10/30/2026

Metropolitan Council·Minnesota

65% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

Washington Suburban Sanitary Commission, MD·Maryland

65% match

Water Engineering Services (BOA)

Closes 11/18/2026Opened 10/14/2026

NYS Town of Tonawanda Water Treatment Department·New York

65% match

MWBE/SDVOB - WTP Electrical and Pump Improvements

Closes 11/6/2026Opened 10/14/2026

City of Holly Grove·Arkansas

65% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of Alexandria·Louisiana

65% match

City of Alexandria - Water System Improvements - Hwy 1 South Booster Station, Ground Storage Tank & Water Main

Closes 11/3/2026Opened 10/2/2026

Western Virginia Water Authority·Virginia

64% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Western Virginia Water Authority·Virginia

64% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Health, NYS Dept. of·New York

64% match

Drinking Water Fluoridation – Rolling Submissions - Component A: Planning and Feasibility Projects (DOH01-DWFAR-2023) - Component B: Implementation and Maintenance Projects - (DOH01-DWFBR-2023)

Closes 9/28/2028Opened 12/21/2022

Town of Jupiter·Florida

63% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Health And Human Services·Arizona

63% match

SRSU - Water System Installation and Upgrade

Closes 2/17/2029Opened 2/10/2026

City of Fredonia·Kansas

63% match

Distribution System Improvements - Fredonia, KS

Closes 11/12/2026Opened 10/29/2026

Saline County Waterworks and Sanitary Sewer Public Facilities Board·Arkansas

63% match

Saline County Waterworks & Sanitary Sewer Public Facilities Board – WWTP Improvements

Closes 11/12/2026Opened 10/18/2026

Santa Maria-Bonita School District·California

63% match

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026Opened 10/30/2026

Dept of Natural Resources·Wisconsin

62% match

Private Drinking Water Treatment System Consulting, Equipment and Installation Services – Marinette

Closes 11/13/2026Opened 10/26/2026

Mississippi

62% match

2020 Water Distribution System Additions

Closes 11/4/2026Opened 10/30/2026

Town of Eatonville·Florida

62% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of South San Francisco·California

62% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

City of Douglas·Wyoming

62% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026