The Kansas Department of Corrections is requesting bids for the purchase and installation of two mechanical dock levelers at the El Dorado Correctional Facility. The existing dock levelers have a 16” lip and a 24” deep pit, and the new dock levelers must have the same measurements. The contractor must remove the existing dock levelers and install the new ones, and provide a one-year warranty on all parts and labor. The contractor will be escorted and supervised at all times during the project. Some key requirements include:
• Model: Two mechanical dock levelers
• Size: 7’ wide X 8’ long dock levelers
• Capacity: 35,000 – 40,000 lbs
• Features: 16” lip, rear brush weather seal, 24” conversion
The project requires the removal and installation of two mechanical dock levelers, and the contractor must specify the timeframe for delivery, which may be a major factor in the evaluation process.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.