Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Environmental Services
  5. ›RFQ - Richardson WTP Membrane Pilot Project

Cape Fear Public Utility Authority·North Carolina

RFQ - Richardson WTP Membrane Pilot Project

Closes 9/8/2026$200k – $500kRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Cape Fear Public Utility Authority (CFPUA) is seeking a qualified engineering consulting firm to provide professional engineering services for the Membrane Pilot Project at the Richardson Water Treatment Plant (WTP). The selected consultant will be responsible for designing, operating, testing, and evaluating pilot-scale reverse osmosis (RO) membrane treatment systems for public drinking water applications. The scope of work includes establishing project performance objectives, performance-based monitoring and evaluation of commercially available low-pressure reverse osmosis (LP-RO) membranes, identifying and evaluating qualified membrane manufacturers and suppliers, designing and furnishing a pilot-scale membrane treatment system, and providing operational, maintenance, troubleshooting, and engineering support throughout the pilot testing period. • Establish project performance objectives and owner-defined treatment criteria for the membrane pilot program • Performance-based monitoring and evaluation of commercially available low-pressure reverse osmosis (LP-RO) membranes • Identify, evaluate, and solicit qualified membrane manufacturers and suppliers capable of providing pilot-scale membrane elements • Design and furnish a pilot-scale membrane treatment system and necessary components • Develop a comprehensive pilot testing plan that includes startup procedures, operating protocols, monitoring requirements, sampling frequency, analytical testing, membrane cleaning procedures, quality assurance/quality control (QA/QC), and performance evaluation criteria • Provide operational, maintenance, troubleshooting, and engineering support throughout the pilot testing period • Analyze pilot testing results and prepare a final pilot study technical memoranda documenting membrane performance, treatment effectiveness, operational considerations, design criteria, recommended membrane selection, and estimated full-scale capital, operation and maintenance, and lifecycle costs

Attached files

Contact

Ben Guerrieri(Procurement Manager)

[email protected]

(910) 332-6472 or (910) 332-6651

Key dates

Opened
8/7/2026
Questions due
9/1/2026
Closes
9/8/2026

Last updated

Details

Type
Request for Qualification
Industry
Environmental Services
NAICS
541620

Budget estimate

$200,000 – $500,000

The budget for this project is difficult to estimate without more information on the scope and complexity of the work. However, based on the fact that the project involves designing and evaluating pilot-scale reverse osmosis membrane treatment systems, the budget could be in the range of $200,000 to $500,000. This estimate is influenced by the fact that the project requires specialized engineering services and equipment, and the authority has a budget for the project. The actual budget could be higher or lower, depending on the specifics of the project and the authority's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Washington Suburban Sanitary Commission, MD·Maryland

Top match · 68%

Potomac WFP Water Quality/PFAS Pilot Project

Closes 12/1/2026Opened 10/14/2026

City of Bakersfield·California

67% match

RFP/Q - WWTP No. 2 and WWTP No.3 Phase 0 Projects

Closes 11/19/2026Opened 10/9/2026

Texas Tx Comm On Environ Quality·Texas

67% match

Membrane Filters

Closes 11/4/2026Opened 10/20/2026

U.S. Department Of Energy·Ohio

66% match

TECHNOLOGY LICENSING OPPORTUNITY: PBI High-Temperature Hollow Fiber Membranes

Closes 12/4/2026Opened 6/5/2026

Washington Suburban Sanitary Commission·Maryland

66% match

Potomac WFP Water Quality/PFAS Pilot Project REBID

Closes 12/1/2026Opened 10/14/2026

U.S. Department Of The Interior·Colorado

65% match

46--EC - LMDT MEMBRANE FILTERS

Closes 1/4/2030Opened 1/8/2021

Alabama State Port Authority·Alabama

64% match

RFQ/RFP-Upper Mobile Bay Beneficial Use Wetland Creation (Implementation) – Phase 1

Closes 11/6/2026Opened 9/22/2026

Connecticut Town of Stafford·Connecticut

64% match

RFQ: On-Call Engineering Services for Wastewater-Related Needs

Closes 11/17/2026Opened 10/28/2026

New York City Department of Design and Construction·New York

63% match

INSTALLATION OF COLD FLUID APPLIED REINFORCED MEMBRANE ROOFING SYSTEM

Rolling / TBD closeOpened 6/17/2016

Renewable Water Resources·South Carolina

63% match

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Closes 12/4/2026Opened 10/15/2026

Massachusetts Department of Environmental Protection·Massachusetts

63% match

DEP-BPE-RFR-2026-CERP-Wastewater Energy Recovery Pilot Grant (WWER) GRANT ANNOUNCEMENT ONLY

Closes 10/23/2028Opened 5/8/2026

North Carolina City of Raleigh Public Utilities Department·North Carolina

63% match

EM Johnson WTP

Closes 12/7/2026Opened 10/30/2026

Louisiana City of Mandeville·Louisiana

63% match

WWTP PAA DISINFECTION, CITY PROJECT NO.: 212.26.002

Closes 11/4/2026Opened 9/22/2026

City of Cincinnati·Ohio

63% match

Polk Run WWTP Anaerobic Selector (10280726)

Closes 11/17/2026Opened 10/28/2026

Town of Jupiter·Florida

63% match

RO Plant Improvements & Membrane Replacements (W2010)

Closes 11/10/2026Opened 10/6/2026

U.S. Department Of Defense·District of Columbia

62% match

N0017327Q5317- Roof Membrane Replacement and Waterproofing

Closes 11/6/2026Opened 10/27/2026

City of Cincinnati - Purchasing Division·Ohio

62% match

Polk Run WWTP Anaerobic Selector (10280726)

Closes 11/17/2026Opened 10/27/2026

El Paso Water·Texas

62% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Ontario·California

62% match

Pure Water Ontario Advanced Water Purification Facility (UT1091)

Closes 11/13/2026Opened 10/15/2026

New York City Department of Design and Construction·New York

62% match

Installation of Cold Fluid Applied Reinforced Membrane Roofing System

Rolling / TBD closeOpened 4/24/2025

U.S. Department Of Defense·New York

62% match

AERIAL LAYER NETWORKING & TRANSMISSION TECHNOLOGIES

Closes 9/30/2027Opened 2/16/2023

Loudoun Water·Virginia

62% match

BRWRF Phase lll - Package ll

Closes 1/14/2027Opened 9/14/2026

El Paso Water·Texas

62% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 11/25/2026Opened 9/20/2026

City of Wilmington·Delaware

62% match

25035PW-R – Porter Water Filter Plant Electrical Upgrade Project

Closes 11/3/2026Opened 10/8/2026

El Paso Water·Texas

62% match

Renewable Natural Gas (RNG) Facility at Roberto R. Bustamante Wastewater Treatment Plant (RRBWWTP)

Closes 12/2/2026Opened 9/20/2026