Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wyoming guideWyoming Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Wyoming
  4. ›Construction
  5. ›Elk Fork Fish Screen and Irrigation Improvement Project

Trout Unlimited·Wyoming

Elk Fork Fish Screen and Irrigation Improvement Project

Closes 4/8/2026$500k – $2MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Elk Fork Fish Screen and Irrigation Improvement Project aims to prevent fish entrainment through the installation of a fish screen, improve water conveyance by installing irrigation pipe in the existing ditch, and improve irrigation efficiency by installing an irrigation system to run a wheel line system. The project is located on the Shoshone National Forest, at the Elk Fork headgate, with the ditch running through the Elk Fork Campground and to the west and east pastures that are located adjacent to the Wapiti Ranger Station. • The project involves the installation of a fish screen and irrigation system improvements. • The contractor should be familiar with fish screens and irrigation systems and improvements. • The project is funded in whole or in part by federal funds. • The contractor must comply with all federal requirements and regulations. • The contractor must provide proof of insurance and furnish proof of liability insurance, including general liability coverage, covering the services performed for Trout Unlimited.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Brittany Swope(Project Manager)

[email protected]

(307) 250-1065

Key dates

Opened
3/4/2026
Questions due
3/25/2026
Pre-bid meeting
3/19/2026Mandatory
Closes
4/8/2026
Projected award
4/15/2026
Duration
117 days

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
237990
Solicitation №
2026_002

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes the installation of a fish screen and irrigation system improvements. The cost of materials, equipment, and labor will be significant factors in determining the budget. Assuming a moderate level of complexity and a relatively small project size, the budget could be in the range of $500,000 to $2,000,000. However, this is a rough estimate and the actual budget could be higher or lower, depending on various factors such as the contractor's experience, the project's location, and the level of competition.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Grants·California

Top match · 71%

Wildlife Corridor and Fish Passage

Rolling / TBD closeOpened 6/18/2025

California Grants·California

71% match

Proposition 68 Fish and Wildlife Improvement Grant Program

Rolling / TBD closeOpened 4/8/2025

Illinois Natural Resources·Illinois

70% match

Illinois support of Ohio River Basin Asian Carp control and management (FY26)

Rolling / TBD closeOpened 6/1/2025

U.S. Fish and Wildlife Service·United States of America

70% match

F26AS00105 National Fish Passage Program

Closes 4/30/2027Opened 8/24/2026

Santa Clara Valley Water District·California

69% match

Fishery Habitat Characterization and Identification of Restoration Opportunities: Stevens Creek

Closes 12/7/2026Opened 10/21/2026

California Grants·California

69% match

Stream Flow Enhancement

Rolling / TBD closeOpened 6/6/2025

California Grants·California

68% match

Proposition 68 Fish and Wildlife Improvement Grant Opportunities – (Including Severely Disadvantaged Communities)

Rolling / TBD closeOpened 6/18/2025

U.S. DOC NOAA - ERA Production·United States of America

68% match

NOAA Great Lakes Fish Habitat Restoration Partnership Grants

Rolling / TBD closeOpened 8/27/2024

Illinois Natural Resources·Illinois

68% match

Illinois support of Ohio River Basin Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024

Illinois Natural Resources·Illinois

68% match

Invasive Carp removal and monitoring in the Upper Mississippi River FY26

Rolling / TBD closeOpened 6/1/2025

California Grants·California

68% match

Proposition 68 Rivers and Streams Grant Program – Klamath-Trinity Watershed

Rolling / TBD closeOpened 6/17/2025

California Grants·California

67% match

Watershed Resilience Conservation Implementation

Rolling / TBD closeOpened 8/4/2026

California Grants·California

67% match

Proposition 68 Rivers and Streams Grant Program

Rolling / TBD closeOpened 6/18/2025

Illinois Natural Resources·Illinois

67% match

Illinois support of Upper Mississippi River Asian Carp control and management (FY25)

Rolling / TBD closeOpened 6/1/2024

Illinois Natural Resources·Illinois

67% match

Invasive Carp Management Control in IL Waterway GLRI (FY25) (CAFWS-176 170, and 164)

Rolling / TBD closeOpened 5/20/2024

Illinois Natural Resources·Illinois

67% match

Invasive Carp removal and monitoring in the Upper Mississippi River (CAFWS-181)

Rolling / TBD closeOpened 1/1/2026

Washakie County Conservation District·Wyoming

66% match

Big Horn River Bank Stabilization Project

Closes 12/1/2026Opened 10/29/2026

Illinois Natural Resources·Illinois

66% match

Invasive Carp Management Control in IL Waterway GLRI (FY26)

Rolling / TBD closeOpened 12/21/2025

California Grants·California

66% match

Nature Based Solutions – Wildlife Corridors

Rolling / TBD closeOpened 6/16/2025

Clean River Partners·Minnesota

66% match

Clean River Partners Cannon River Fish Passage Improvements Project No. 24X.135410

Closes 11/20/2026Opened 10/29/2026

U.S. Fish and Wildlife Service·United States of America

66% match

F26AS00085 Aquatic Invasive Species Interjurisdictional Grants to the Great Lakes States and Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/20/2026

Illinois Natural Resources·Illinois

66% match

Invasive Carp Management Control in IL Waterway GLRI (CAFWS-183)

Rolling / TBD closeOpened 1/1/2026

U.S. Department Of Defense·Kentucky

66% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

Illinois Natural Resources·Illinois

66% match

Illinois support of Ohio River Basin Asian Carp control and management (CAFWS-182)

Rolling / TBD closeOpened 1/1/2026

U.S. Fish and Wildlife Service·United States of America

66% match

F26AS00084 Aquatic Invasive Species Grants to Great Lakes Tribes - Fiscal Year 2026 Great Lakes Restoration Initiative

Closes 12/31/2026Opened 5/7/2026