The Colorado River Commission of Nevada seeks qualified vendors to provide comprehensive high‑voltage system engineering services for its transmission and distribution network, covering design, analysis, SCADA programming, and related deliverables over a four‑year contract. Evaluation will heavily weigh technical compliance (50% for scope coverage) and industry experience (35%), with an 8% cost factor and a small preference for non‑redlined contracts. Vendors must submit detailed technical proposals, cost schedules, staff resumes, and meet stringent insurance and regulatory requirements, including a Nevada‑based business preference and a “no boycott of Israel” clause. The solicitation includes a pre‑bid question deadline, a proposal submission deadline, and an estimated award date in late November 2026.
• Provide engineering design, analysis, and documentation for multiple high‑voltage substations and transmission lines.
• Deliver SCADA system programming, protection coordination studies, and network upgrade plans.
• Submit a cost proposal (Attachment E) and required certifications, including insurance meeting the limits in Attachment D.
• Meet mandatory Nevada licensing, insurance, and “no boycott” requirements; maintain a 30‑day notice for insurance cancellations.
• Evaluation emphasizes full coverage of the Scope of Work (50 %), relevant industry experience (35 %), and competitive cost (8 %).
Attached files
Contact
David Rodriguez(Power Systems Engineering Manager)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.