This solicitation calls for a construction contract to upgrade the sanitary infrastructure at Terminal B, Pier A of Logan International Airport. The work includes demolition of abandoned ejector pumps and oil interceptors, concrete back‑fill, installation of new floor sinks, drains, and a lift station, as well as associated plumbing and electrical systems. The contractor must coordinate multiple trades, meet strict airport safety and security requirements, and comply with Massachusetts prevailing‑wage, M/WBE participation, and OSHA training mandates.
• Demolition of existing sanitary equipment and abandonment of underground piping.
• Concrete work to fill pits, install grade beams, and finish floors to match existing conditions.
• Installation of new plumbing fixtures, pumps, and related electrical power and lighting.
• Mandatory bid bond (5 % of bid), performance/pay‑roll bonds, $20 M liability insurance, and 8.8 % M/WBE subcontracting goal.
• Project schedule of roughly 120 calendar days after Notice‑to‑Proceed, with a target substantial completion in early 2027.